BART to Silicon Valley: - Santa Clara Valley Transportation Authority
skip to main content skip to related links skip to website navigation links
VTA Home
Customer Service Phone: (408) 321-2300


   Related Links


   Project Overview

       Benefits
       Schedule
       Funding

   Project Development

       Planning
       Environmental
       Engineering

   Community Outreach

       Calendar
       Contact Us

   Documents Library

       News Releases
       Multimedia
       Meeting Summaries
       Reports
       Other Documents

   Q & A

   Construction Activity


Contact Information:

  Community Outreach
  (408) 321-7575
  vtabart@vta.org



Document Library

Other Documents

Date      Document
08/26/2009      BART Policy Advisory Board Packet
Read the information packet for the August 26, 2009 BART Policy Advisory Board meeting to learn the newest information on the BART Silicon Valley Extension
 
08/11/2009      BART Questions and Answers Fact Sheet
An easy-to-read list of the most common questions received on the BART Silicon Valley Extension Project with concise, factual answers provided.
 
07/21/2009      BART Silicon Valley Extenstion Fact Sheet
Read a concise, factual overview of the entire BART Silicon Valley Extension
 
07/21/2009      Dixon Landing Matrix Handout
Includes a comparison matrix for design options at Dixon Landing Road. Options include building Dixon Landing underneath the current railroad (Dixon Grade Separation) or building BART underneath Dixon Landing (Dixon Retained Cut). Also include visual renderings of each situation.
 
03/13/2008      Draft Environmental Impact Statement
FTA, in coordination with VTA, has prepared a Draft Environmental Impact Statement (EIS) for the project to address short- and long-term environmental impacts of the three project alternatives listed below: 1. Future No-Build 2. Berryessa Extenion Project (extending the BART alignment from the Warm Springs Station to terminate near Las Plumas Avenue in San Jose). 3. Silicon Valley Rapid Transit Project (extending the BART alignment from the Warm Springs Station through Milpitas and San Jose and terminating in Santa Clara).
 
01/10/2008      Impact Assessment Methodologies
Including environmental topic and criteria to determine substantial effects and the impact assessment methodologies
 
01/10/2008      SVRT Final Coordination Plan
The Federal Safe, Accountable, Flexible, Effi cient Transportation Equity Act: A Legacy for Users (SAFETEA-LU 6002), Section 6002, requires the development and implementation of a Coordination Plan to provide for agency and public participation during the environmental review process for a project being evaluated in an environmental impact statement (EIS).
 
10/09/2007      Draft EIS Public Scoping Meeting Display Boards 1-10
All display boards used in October 2007 Draft EIS Scoping Meetings
 
09/27/2007      Draft EIS Public Scoping Meeting Notice
Official notice of Draft EIS Scoping meeting in accessible format
 
09/21/2007      Federal Notice of Intent for the Draft EIS
Official federal approval for the study of environmental impacts of the BART to Silicon Valley Project
 
09/10/2007      BART to Silicon Valley Tunnel Fact Sheet
Concise information on the Downtown San Jose subway
 
09/10/2007      Ventilation Facility Fact Sheet
Concise information on the vent shafts for the Downtown San Jose subway
 
06/27/2007      Remedial Action Plan Fact Sheet
For the mitigation of contaminated soils within a project area
 
06/14/2007      Newhall Yard Remidial Action Plan
Remedial Action Plan for Former UPRR Newhall Yard San Jose and Santa Clara, California
 
02/26/2007      Draft EIS Comment Card
This comment card provides the opportunity for the public to comment on the Draft Supplemental Environmental Impact Report (SEIR).
 
01/01/2007      Final Supplemental Environmental Impact Report
A draft EIS/EIR was initially written as a combined federal/state document in accordance with the NEPA and CEQA requirements. However, subsequent to the public review of the final EIS/EIR, VTA withdrew the BART Alternative from the federal environmental review and preliminary engineering process. VTA agreed with FTA to address funding and project cost effectiveness issues before proceeding with the federal process. In December 2004, the VTA Board of Directors certified the Final Environmental Impact Report.
 
04/15/2004      Citizens' Guide to the Draft EIS/EIR
This guide is intended to be a user-friendly overview of key environmental considerations that would result from the construction and long-term operation of the proposed BART Extension to Milpitas, San Jose and Santa Clara. While this guide summarizes highlights of the Draft EIS/EIR, it is not legally considered to be a part of the formal Draft EIS/EIR.
 
05/12/2003      Environmental Fact Sheet
This fact sheet provides a general overview of what is studied in an Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for a major transit project, along with the process for determining impacts and mitigation measures.
 
11/01/2001      Major Investment Study (MIS) Final Report
This document is the final report of the Major Investment Study (MIS) Phase. The report provides an overview of the MIS purpose and scope and gives a description of the alternatives carried forward for detailed analysis. Note: Some of the report figures and the appendices are not available through the website.