Santa Clara/Alum Rock

The Santa Clara/Alum Rock Bus Rapid Transit Project will provide limited-stop rapid transit service for 7.2 miles, from the Eastridge Transit Center to the Arena Station in downtown San Jose using Capitol Expressway, Alum Rock Avenue and Santa Clara Street. The Santa Clara/Alum Rock Project is the first of three lines, followed by the El Camino Real BRT and Stevens Creek BRT.

Santa Clara Alum Rock Corridor

The Santa Clara/Alum Rock Rapid Transit service will include the following features:
  • Special Vehicles – Equipped with green technology and comfortable, modern interiors
  • Enhanced Stations – Attractive shelters, passenger amenities and advanced features
  • Dedicated Lane on Alum Rock – East of 34th street BRT vehicles will travel in a dedicated median bus-way, separated from traffic to improve travel time
  • Transit Signal Priority – Traffic signals stay green as the vehicle approaches the inter­section for faster travel time 
  • High-Tech Communications – ‘Up-to-the-minute’ information through electronic message signs at stations and wireless capabilities
  • Rapid Boarding – Ticket machines and all-door boarding means faster stops
  • Fast, Frequent, Reliable – BRT lines will operate during the peak times with service every 10 minutes

Service would be provided at 11 stations:

 Arena  24th  Story
 Downtown San Jose  King  Ocala
 City Hall  Jackson                

 Eastridge               

 17th  Alum Rock  
 

Project Cost and Funding

The total cost for the Santa Clara/Alum Rock Bus Rapid Transit Project is $114 million. The Metropolitan Transportation Commission (MTC) allocated $90 million from State Proposition 1B funds specifically for the BRT project. The remaining $24 million needed for the project will be funded through the 2000 Measure A Transit Improvements Program.

Project Schedule

VTA Board approves Environmental Impact Report December 11, 2008
BRT Buses available for circulation Summer 2014
Final Design Spring 2013
Construction Fall 2013-Fall 2015
Project Completion Fall 2015
Santa Clara/Alum Rock Project Fact Sheet

Mexico  Vietnamese  Simplified Chinese Korea  Philippines

How to reach us

For more information on the El Camino Real BRT Project or existing bus and light rail transit services, call VTA Community Outreach at (408) 321-7575, TTY only (408) 321-2330 or email community.outreach@vta.org.