The following is a list of all closed solicitations. It is no longer possible to bid on these solicitations.
|
RFP
11-20: Workers' Compensation Claims TPA and Managed Care Services
|
|
Recommended Award Date: |
Jan 27, 12 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
TRISTAR Risk Management
|
| |
203 N. Golden Circle Suite 200 Santa Ana, CA 92705 |
|
Comments:
|
VTA seeks proposals from qualified firms to provide WC Claims TPA Services and Managed Care Services***Please ensure you download ALL Appendices (A, B and C) as they are part of this RFP 11-20.***
|
|
RFP
12-02: Light Rail Vehicle Cameras and Microphones Installation Project
|
|
Recommended Award Date: |
Jan 26, 12 |
|
Administrator:
|
Mae Ma
|
|
Recommended Award To:
|
Kratos|HBE
|
| |
17-01 Pollitt Drive Fair Lawn, NJ 07410 |
|
Comments:
|
1/26/12 RFP 12-02 Award has been made to Kratos Public Safety & Security Solutions,Inc.**************
1/9/12 Addendum No. 1 to RFP 12-02 has been issued.****PLEASE NOTE CORRECTION: The contact number for this RFP is incorrect on the RFP cover. Please use (408) 546-7959 to contact Mae Ma.*****Santa Clara Valley Transportation Authority (VTA) seeks proposals from qualified firms to furnish and install cameras and microphones on the Light Rail Vehicles (LRV).
|
|
RFP
11-17: State Legislative Consultant Services
|
|
Recommended Award Date: |
Jan 05, 12 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
01/05/12 ~ Notice of Recommended Award issued to Gonzalez, Quintana & Hunter, LLC********************* VTA is seeking Proposals from qualified firms to provide State Legislative Consultant Services.
|
|
RFP
11-16: Hosted Web-Based SBE/DBE and Labor Compliance System
|
|
Recommended Award Date: |
Nov 10, 11 |
|
Administrator:
|
Ephraim Cadaing
|
|
Recommended Award To:
|
B2Gnow
|
| |
5025 N. Central Ave., #494 Phoenix, AZ 85012 |
|
Comments:
|
***Notice of Recommeded Award for VTA RFP 11-16 was sent to B2GNow on November 9, 2011***
|
|
RFP
11-11: Actuarial Services For Workers Compensation etc.
|
|
Recommended Award Date: |
Sep 26, 11 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
09/26/11 ~ Notice of Recommended Award issued to Oliver Wyman Actuarial Consulting, Inc. ********************* 07/19/11 ~ Addendum No. 1 has been issued. Proposers must download, sign & submit Acknowledgement to Addendum No. 1 with Proposals ************************VTA is seeking Proposals from qualified firms to provide Actuarial Services for VTA's Workers Compensation & Public Liability/Property Damage Program Reserve Fund. PLEASE BE SURE TO DOWNLOAD "ALL" DOCUMENTS.
|
|
RFP
11-12: Eng. Design Services-Guadalupe Emergency Generator Upgrade
|
|
Recommended Award Date: |
Sep 21, 11 |
|
Administrator:
|
Mae Ma
|
|
Recommended Award To:
|
Advance Design Consultants
|
| |
998 PARK AVE. SAN JOSE, CA 95126 |
|
Comments:
|
09/21/11 ~ Notice of Recommended Award issued to Advance Design Consultants **** 8/15/11 Questions and Answers to RFP 11-12 have been posted.****** The Santa Clara Valley Transportation Authority (VTA) seeks proposals from qualified firms to provide engineering design services for Guadalupe Emergency Upgrade Project.
|
|
RFP
11-10: Substance Abuse Professional Services
|
|
Recommended Award Date: |
Sep 01, 11 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract awarded to Free Life Enterprises.***************************VTA is seeking Proposals from qualified firms to provide Substance Abuse Professional Services.
|
|
RFP
10-24: Property Liability/Property Damage Third Party Admin Services
|
|
Recommended Award Date: |
Apr 07, 11 |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
Carl Warren & Company
|
| |
11209 N. Tatum Blvd. #130 Phoenix, AZ 85028 |
|
Comments:
|
VTA will recommend award to vendor shown at the Board of Directors Meeting to be held on April 7, 2011.
|
|
RFP
10-22: SCVTA - ATU, Local 265 Pension Plan Actuarial Services
|
|
Recommended Award Date: |
Feb 16, 11 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
(12/16/10) Addendum No.1 has been posted along with three Attachments. Proposers must download all four documents, sign & submit Addendum No. 1 with Proposals. ************************************ VTA is seeking Proposals from qualified firms to provide Pension Plan Actuarial Services for the SCVTA/ATU, Local 265 Pension Plan.
|
|
RFP
10-21: Graphics & Desktop Publishing for Quarterly Service Changes
|
|
Recommended Award Date: |
Feb 03, 11 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
***************************************12/02/10 Addendum No. 1 has been issued. Proposers must download, sign & submit Addendum No. 1 with Proposals ************************ VTA is seeking Proposals from qualified firms to provide Graphics and Desktop Publishing for Quarterly Service Changes. Please ensure you download the RFP and ALL separate documents attached hereto as Appendices B1-B6.
|
|
RFP
RFQ10-20: SVBX Prequalification for Design-Build Entities
|
|
Recommended Award Date: |
Dec 09, 10 |
|
Administrator:
|
Trish Kane
|
|
Recommended Award To:
|
INPUT
|
| |
10790 Parkridge Boulevard # 200 Reston, VA 20191 |
|
Comments:
|
Notice: 01/07/2010 - For interested subcontractors - A revised list of the contact information and DB Proposer's addresses have been provided in a new attachment.
|
|
RFP
10-17: Operations Insurance Broker Services
|
|
Recommended Award Date: |
Nov 04, 10 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract was awarded to Alliant Insurance Services, Inc. on 10/6/10 to provide Operations Insurance Broker services for VTA.
***************************************
8/18/10 Addendum No.1 has been posted along with Addendum No. 1 Attachment A. Proposers must download both documents, sign & submit with proposals.************************ VTA seeks proposals from qualified firms to provide all professional insurance broker services necessary to design and obtain a cost-effective insurance coverage plan for the operations of VTA and Risk Management consulting services. Please ensure you download Appendices B-3 through B-7 as they are part of this RFP 10-17
|
|
RFP
10-16: Real Estate Development Services
|
|
Recommended Award Date: |
Nov 04, 10 |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA Board of Directors approved the recommended list of 29 qualified firms for various categories of development services.
|
|
RFP
10-10: Wireless Equipment and Cellular Services
|
|
Recommended Award Date: |
Sep 02, 10 |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA Board of Directors provided approval to award contracts to Sprint (Nextel of California) and AT&T Mobility.
|
|
IFB
IFB 10-015-P15: Supply & Delivery of Diesel Exhaust Fluid (DEF)
|
|
Recommended Award Date: |
Jul 29, 10 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
This serves as notice that VTA intends to issue a contract to Southern Counties Lubricants LLC as the lowest responsive and responsible bidder. Any award is contingent on VTA Management and Board approval when required. While there is no guarantee of approval it is anticipated that an award will be made on or about September 1, 2010.
|
|
RFP
10-09: Recruitment Advertising Broker Services
|
|
Recommended Award Date: |
May 26, 10 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract was awarded to CKR Interactive on 5/26/10 to provide Recruitment Advertising Broker services for VTA.
|
|
RFP
10-02: Actuarial Services - Other Post Employment Benefits
|
|
Recommended Award Date: |
Mar 23, 10 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract was awarded to EFI Actuaries on March 23, 2010 to provide actuarial services in connection with VTA's other post employment benefits.
|
|
IFB
09-142-P15: Heavy Duty Wheel Alignment System
|
|
Recommended Award Date: |
Mar 22, 10 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
This serves as notice that VTA intends to issue a contract to Bee Line Company as the lowest responsive responsible bidder. Any award is contingent on VTA Management and Board approval when required. While there is no guarantee of approval it is anticipated that an award will be made March 4, 2010.
|
|
RFP
09-21: Federal Advocacy Consultant Services
|
|
Recommended Award Date: |
Jan 07, 10 |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
Van Scoyoc Associates
|
| |
101 Constitution Avenue, NW Suite 600 West Washington, DC 20001 |
|
Comments:
|
__________________*****____________ VTA seeks proposals from qualified firms to provide VTA with effective representation regarding federal surface transportation initiatives before Congress, federal agencies, and related interest groups. Contract services for a Washington, D.C. liaison are being sought to analyze federal legislation, policies, and regulations affecting VTA, and to develop strategies for advancing actions at the federal level that are beneficial to VTA and its programs.
|
|
IFB
137-P11: Purple Nitrile Powder Free Gloves
|
|
Recommended Award Date: |
Jan 06, 10 |
|
Administrator:
|
Jusania Meng
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
See the solicitation documentation for full details.
|
|
RFP
09-15: Transit Advertising Program
|
|
Recommended Award Date: |
Dec 10, 09 |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
Lamar Transit Advertising
|
| |
1600 Valeey River Dr Suite 390 Eugene, OR 97401 |
|
Comments:
|
VTA Board of Directors approved the recommended firm, Lamar Transit Advertising, on December 10, 2009.
|
|
RFP
09-14: Drug Testing Laboratory Services
|
|
Recommended Award Date: |
Sep 22, 09 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract was awarded to Phamatech, Inc. on 9/22/08 to provide urine drug testing laboratory services for VTA.
|
|
RFP
09-11: VTA-ATU, Local 265 Pension Plan Legal Advisory Services
|
|
Recommended Award Date: |
Sep 10, 09 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract was awarded to Saltzman & Johnson Law Corp. on 9/10/09 to provide legal advisory services in connection with the Plan.
|
|
RFP
09-12: Sales Tax Auditing & Recovery Services
|
|
Recommended Award Date: |
Sep 03, 09 |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
MuniServices, LLC
|
| |
7335 N. Palm Bluffs Avenue Fresno, CA 93711 |
|
Comments:
|
Addendum No.2, dated May 29, 2009 has been posted. Proposers are reminded to submit the signed acknowledgement of receipt for this addendum, at time of proposal submittal.
__________________*****____________
Addendum No.1, dated May 27, 2009 has been posted. Proposers are reminded to submit the signed acknowledgement of receipt for this addendum, at time of proposal submittal.
__________________*****____________ VTA seeks proposals from qualified firms to provide Transaction and Use Tax Auditing and Recovery Services.
|
|
RFP
08-22: Language Translation & Desktop Publishing
|
|
Recommended Award Date: |
Feb 18, 09 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Award has been made to the following three firms: Richard Schneider Enterprises, Inc., Jungle Communications, Inc. & International Contact, Inc. to provide translations and desktop publishing of newsletters, brochures, direct mail, posters, signage, carcards, and print avertisements as required for VTA. Make sure to download all documents for this RFP.
|
|
RFP
08-17: Security and Protective Services
|
|
Recommended Award Date: |
Feb 05, 09 |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
AlliedBarton Security Services
|
| |
2540 N. First Street Suite 101 San Jose, CA 95131 |
|
Comments:
|
VTA will recommend award of a contract to AlliedBarton Security Services. Any award is contingent on VTA Management and Board approval when required. While there is no guarantee of approval, it is anticipated that an award will be made at the Board of Directors meeting scheduled for February 5, 2009.
_______________________________________*** Addendum No.1, dated Oct/7/08 has been posted. This document contains changes to the RFP and required forms as well as answers to questions posed by RFP subscribers.
_______________________________________
Santa Clara Valley Transportation Authority (VTA)seeks proposals from security firms to provide qualified, trained, and State of California certified (armed and unarmed) uniformed security personnel for assignment to selected public transportation facilities, light rail and bus operating divisions and its administrative facility.
|
|
RFP
08-18: Temporary Personnel Service
|
|
Recommended Award Date: |
Jan 08, 09 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contracts have been awarded to the following 7 firms: Apple One, CoreTechs, Cornerstone, Global Infotech, Josephine's, Robert Half, & Venturi Staffing to provide temporary personnel, qualified by experience, training/education to perform work as required for VTA.
|
|
RFP
08-13: 2008-2012 MONITORING & CONFORMANCE CONTRACT
|
|
Recommended Award Date: |
Aug 04, 08 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract was awarded to Dowling Associates, Inc. on 8/4/08 to collect, analyze and document data for VTA's Traffic Monitoring & Conformance Reports.
|
|
IFB
08-05: VTA ALTAMONT COMMUTER EXPRESS (ACE) SHUTTLE PROGRAM
|
|
Recommended Award Date: |
Jul 05, 08 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract was awarded to El Paseo Limousine on July 30, 2008 to provide shuttle services to designated employment centers and light rail stations from ACE Train Stations.
|
|
IFB
08-02: Actuarial Services - Retiree Medical Trust Fund
|
|
Recommended Award Date: |
May 05, 08 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract was awarded to Bickmore Risk Services, Inc. on 5/5/08.
|
|
RFP
RFP 07-11: Advanced Farebox System Consultant Services
|
|
Recommended Award Date: |
Apr 07, 08 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract has been awarded to Booz Allen Hamilton.
|
|
IFB
07-564-P15: Bulk Supply of Antifreeze
|
|
Recommended Award Date: |
Sep 19, 07 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
The Santa Clara Valley Transportation Authority (VTA) is seeking a qualified Contractor to provide Bulk Supply of Antifreeze for VTA vehicle maintenance locations as listed in the attached document.
|
|
IFB
VTA07-550-P01: Hazmat Absorbents
|
|
Recommended Award Date: |
Jan 31, 07 |
|
Administrator:
|
Maureen Raine
|
|
Recommended Award To:
|
New Pig
|
| |
One Pork Ave Tipton, PA 16684 |
|
Comments:
|
This is to advise all registered vendors that the bid has been awarded to the lowest responsible, responsive bidder, New Pig Corporation, for the specified products at an anticipated yearly usage cost of $16,347.87.
|
|
IFB
06-517-P15: Maintain & Repair of Diesel Fueling & Monitoring Systems
|
|
Recommended Award Date: |
Dec 14, 06 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
NOTICE is hereby given that Santa Clara Valley Transportation Authority intends to issue a contract to Service Station Systems, Inc. as the lowest responsive, responsible bidder. Any awardis contingent on VTA Management and Board Approval when required.
It is anticipated that an award will be made in January, 2007.
|
|
RFP
RFI0906: RFI 0906 REAL TIME DYNAMIC PASSENGER INFORMATION
|
|
Recommended Award Date: |
Oct 20, 06 |
|
Administrator:
|
Carolyn Vargas
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA is seeking responses from firms that provide "real-time" transit traveler information systems. The plan is to use the responses to refine system requirements and technical specifications as part of an upcoming Request for Proposal (RFP) to hire a system provider to design, build and implement such a system for VTA. This is a Request for Information not a Request for Proposal.
|
|
RFP
RFQ 06-18: BART Extension: FTA New Starts Financial Plan
|
|
Recommended Award Date: |
Oct 12, 06 |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA is pleased to announce the following three firms have been qualified to perform the subject services as a result of Request for Qualifications (RFQ) 06-18: AECOM Consult, Inc; Booz Allen Hamilton; Connetics Transportation Group.
|
|
RFP
06-02: Printing and Direct Mail Services
|
|
Recommended Award Date: |
May 11, 06 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
PrintMail Pros, Inc.
|
| |
1610 Berryessa San Jose,, CA 95133 |
|
Comments:
|
Contract for Printing and Direct Mail Services is awarded to PrintMail Pros, Inc.
|
|
RFP
05-17: Operations Insurance Broker Services
|
|
Recommended Award Date: |
Jan 05, 06 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
Driver Alliant Insurance Services
|
| |
600 Montgomery Street, 9th Floor San Francisco, CA 94111-2711 |
|
Comments:
|
Contract has been awarded to Driver Alliant Insurance Services.
|
|
IFB
IFB05-528-P15: Installation of Automatic Doors on New Flyer Articulated Coaches
|
|
Recommended Award Date: |
Nov 23, 05 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
Vapor Bus International
|
| |
1010 Johnson Drive Buffalo Grove, IL 60074 |
|
Comments:
|
This serves as notice that VTA has awarded this solicitation to Vapor Bus International as the lowest responsive responsible bidder.
|
|
IFB
RFQ09-19-P15: SB989 Fuel Tank Testing & Certification
|
|
Recommended Award Date: |
Sep 26, 05 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
The Santa Clara Valley Transportation Authority is requesting quotations for inspection, testing and certification of compliance with California Sentate Bill 989 (SB989), as written in the regulations in CCR Title 23, Sec. 2367 (a), utilizing California State approved methods and procedures at VTA bus fueling facility locations.
|
|
IFB
IFB 05-519-P15: S-Hook Restraint Systems for Bus Wheelchair Securement
|
|
Recommended Award Date: |
Jul 29, 05 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
This serves as notice that VTA intends to issue a contract to Nor-Cal Mobility, Inc. as the lowest responsive responsible bidder.
Any award is contingent on VTA Management and Board approval when required.
While there is no guarantee of approval it is anticipated that an award will be made in September 2005.
|
|
IFB
05-512-P01: Miscellaneous Cleaners and Bus Wash
|
|
Recommended Award Date: |
May 31, 05 |
|
Administrator:
|
Maureen Raine
|
|
Recommended Award To:
|
ZEP Manufacturing
|
| |
4429 James Avenue Castro Valley, CA 94546 |
|
Comments:
|
VTA intends to award this solicitation to ZEP Manufacturing for 21 items as the lowest responsive, responsible bid received. 9 items received no bids and will be ordered as needed on regular orders.
|
|
RFP
05-01: Radio Communication System Services
|
|
Recommended Award Date: |
May 05, 05 |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
Motorola Inc.
|
| |
7794 Forsythia Court Pleasanton, CA 94588 |
|
Comments:
|
Notice of Recommended Award issued.
____________
Addendum No.1, dated Feb/15/05 has been posted. It is comprised of two electronic documents: Part A and Part B. Please be sure to download both documents. The Proposal Due Date remains unchanged.
_________
VTA is seeking proposals from qualified firms to provide support services for radio communications systems including preventive and corrective maintenance.
|
|
IFB
ITQ02-21-P15: EXCESS INVENTORY SALE
|
|
Recommended Award Date: |
Apr 08, 05 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
SANTA CLARA VALLEY TRASNPORTATION AUTHORITY IS OFFERING TO THE HIGHEST BIDDER UNUSED NEW AND RECONDITIONED EXCESS SPARE PARTS INVENTORY IN LISTED LOTS. ALL ITEMS ARE SOLD "AS IS, WHERE IS", F.O.B.SAN JOSE, CA.
|
|
RFP
04-19: FREE-LANCE GRAPHIC DESIGN SERVICES
|
|
Recommended Award Date: |
Feb 24, 05 |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
Jill McCoy Design
|
| |
1336 Mildred Ave San Jose, CA 95125 |
|
Comments:
|
Two graphics designers selected: Birdlegs Studio and Jill McCoy Design.
|
|
RFP
04-18: Service Planning Support
|
|
Recommended Award Date: |
Jan 12, 05 |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA will recommend award to DKS Associates, Transportation Management & Design, Cambridge Systematics and Korve Engineering, at the Board of Directors Feb/3/05 meeting.
|
|
IFB
VTA04-611-P05: RAIL GRINDING RE-BID
|
|
Recommended Award Date: |
Sep 16, 04 |
|
Administrator:
|
Dan Collins
|
|
Recommended Award To:
|
harsco track technologies
|
| |
415 n main fairmont, MN 56031 |
|
Comments:
|
9/12/04 Notice of Recommended Award:
The Santa Clara Valley Transportation Authority staff will recommend that its Board of Directors award the above-referenced project to Harsco Track Technologies,Harsco Corporation at the
September 2nd Board Meeting.
________________________________________
The Santa Clara Valley Transportation Authority will receive sealed bids until 3:00 p.m. Friday July 9, 2004
for rail grinding services. Bids will
be received by the Contracts Office
at 3331 North First Street Building A,
San Jose, California 95134-1906. Contract Documents including instructions, and specifications may
be obtained here or by contacting Daniel J. Collins at (408)321-7194,
Fax (408) 954-1360, or email daniel.collins @vta.org.
|
|
IFB
VTA04-600-P05: LIGHT RAIL CAR MOVER
|
|
Recommended Award Date: |
Aug 17, 04 |
|
Administrator:
|
Dan Collins
|
|
Recommended Award To:
|
MITCHELL EQUIPMENT
|
| |
10010 Airport Highway MONCLOVA, OH 43542 |
|
Comments:
|
8/17/04 Award to Mitchell Equipment.
Notice of Recommended Award:
The Santa Clara Valley Transportation Authority will recommend that its Board of Directors award the above-referenced
project to Mitchell Equipment Corporation at the August fifth Board Meeting.
ADDENDUM 1 Posted 3/12/04
ADDENDUM 2 POSTED 4/12/04
The Santa Clara Valley Transportation Authority will receive sealed bids until Friday April 2, 2004 for the purchase of a High Rail Light Rail Car Mover. A Pre-bid conference will be held on Thursday 3-11-03 at 10:00 a.m. Please contact the Contract Administrator to confirm attendance. Bids will be received by the Contracts and Materials Management Office at 3331 North First Street Building A San Jose, California 95134-1906 Contract documents may be downloaded or obtained and examined at this address.
|
|
RFP
04-05: On-Call Architectural, Civil, & Electrical Engr Services
|
|
Recommended Award Date: |
Aug 06, 04 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA desires to contract with professional consulting firms to perform design services for 3 types of on-call services, including architectural consultant services, civil engr consultant services, and electrical engr consultant services.
****************************************
The following firms have been selected as the recommended providers of these respective services, pending approval of the selections by the VTA Board of Directors. ARCHITECTURAL CONSULTANT SERVICES: DKS Associates, Stevens + Associates, and SBA Architects. CIVIL ENGINEERING CONSULTANT SERVICES: Nolte Associates, URS Corporation, Bellecci & Associates, Parsons Brinkerhoff, and Rail Surveyors & Engineers, Inc. ELECTRICAL ENGINEERING CONSULTANT SERVICES: PGH Wong Engineering and MTH Engineers, Inc.
****************************************
The above recommendations have been approved by the VTA Board of Directors, and contracts will be negotiated with the ten (10) firms listed above.
|
|
IFB
VTA 04-605-P15: Bus & Rail Car Wash Systems Maintenance & Repairs
|
|
Recommended Award Date: |
Jul 19, 04 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
Burr Plumbing & Pumping, Inc.
|
| |
1645 Almaden Road San Jose, CA 95125 |
|
Comments:
|
This serves as notice that VTA intends to issue a contract to Burr Plumbing & Pumping, Inc. as the lowest responsive, responsible bidder. Any award is contingent on VTA Management and Board approval when required. While there is no guarantee of approval it isd anticipated that an award will be made June 24, 2004.
|
|
RFP
04-07: Substance Abuse Testing, Med Review Officer, and Med Exam Svcs
|
|
Recommended Award Date: |
Jun 28, 04 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
U.S. HealthWorks
|
| |
1893 Monterey Road Suite 200 San Jose, CA 95112 |
|
Comments:
|
U.S. HealthWorks has been selected as the recommended provider of these services, pending approval of this selection by the VTA Board of Directors.
|
|
RFP
04-06: Traffic Monitoring and Conformance Reports
|
|
Recommended Award Date: |
Jun 03, 04 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
Dowling Associates, Inc.
|
| |
180 Grand Avenue Suite 250 Oakland, CA 94612 |
|
Comments:
|
Contract awarded to: Dowling Associates, Inc.
|
|
IFB
VTA04-604-P05: LIGHT RAIL (WHEEL & RAIL) PROFILE DIGITIZER
|
|
Recommended Award Date: |
May 13, 04 |
|
Administrator:
|
Dan Collins
|
|
Recommended Award To:
|
KLD Labs, Inc.
|
| |
300 Broadway Huntington Station, NY 11746 |
|
Comments:
|
The Santa Clara Valley Transportation
Authority staff has awarded the
above referenced project to KLD Labs
Inc.
Addendum No. 2 posted 4/13/04
Addendum No. 1-A posted 4/07/2004
Addendum No. 1 was corrupted.
Please reference 3 Addendums on Bid
Form.
Addendum No.1 posted 4/06/2004
Notice is hereby given that effective
March 26, 2004 that the Santa Clara Valley Transportation Authority will
recieve sealed bids until 3:00 p.m.
Friday April 23, 2004 for the purchase of a Light Rail (wheel& rail) profile digitizer. Bids will be received by the Contracts and Materials Management Office at 3331 North First Street Building A San Jose, California 95134-1906. Contract Documents may be downloaded here or obtained and examined at this address.
|
|
RFP
RFP 04-03: VTP2030 PLAN DOCUMENT PREPARATION
|
|
Recommended Award Date: |
Apr 01, 04 |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
MIG
|
| |
800 Hearst Avenue Berkeley, CA 94710 |
|
Comments:
|
See the solicitation documentation for full details.
|
|
RFP
03-04: Line Segment Design Consultant for the (SVRT) Project
|
|
Recommended Award Date: |
Apr 01, 04 |
|
Administrator:
|
Camille Williams
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
This is the RFP for the Line Segment Design Consultant for the Silicon Valley Rapid Transit (SVRT) Project. A preproposal conference will be held on 11/13/2003, at 9:00 AM in the Auditorium at 3331 North First Street, San Jose, CA.
|
|
RFP
03-21: Graphics and Desktop Publishing of Quarterly Service Changes
|
|
Recommended Award Date: |
Jan 19, 04 |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
This contract was awarded to Donna Yuen.
|
|
RFP
03-19: Security and Protective Services
|
|
Recommended Award Date: |
Jan 08, 04 |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
Securitas Security Services USA, Inc.
|
| |
591 W. Hamilton Ave. #140 Campbell, CA 95008 |
|
Comments:
|
An agreement with Securitas was approved by the Board on January 8, 2004.
|
|
IFB
VTA03-589-P05: FLOOR SCRUBBERS AND VACUUMS QUARTERLY PREVENTIVE MAINTENANCE
|
|
Recommended Award Date: |
Jan 06, 04 |
|
Administrator:
|
Dan Collins
|
|
Recommended Award To:
|
San Jose Forklift
|
| |
888 Stockton Avenue San Jose, CA 95110 |
|
Comments:
|
This contract was awarded to J's Forklift dba San Jose Forklift.
Notice of Recommended Award:The Santa Clara Valley Staff will recommend that
its Board of Directors award this contract to J's Forklift Inc. dba San Jose Forklift the lowest responsive and responsible bidder. While there is no guarantee of approval,it is anticipated that an award will be made on 12/04/2003.
INVITATION FOR BIDS VTA03-589-P05
THE SANTA CLARA VALLEY TRANSPORTATION AUTHORITY WILL RECEIVE SEALED BIDS UNTIL 3:00 P.M. FRIDAY, OCTORBER 10, 2003 FOR THE FURNISHING OF QUARTERLY PREVENTIVE MAINTENANCE SERVICE FOR VTA OWNED FLOOR SCRUBBERS AND VACUUMS. CONTRACT/BID DOCUMENTS MAY BE OBTAINED BY VISITING VTA'S CAMM WEB PAGE AT WWW.VTA.ORG OR BY CONTACTING DAN COLLINS @ 408-321-7194.
|
|
IFB
M03705: Emergency Generator
|
|
Recommended Award Date: |
Dec 18, 03 |
|
Administrator:
|
Travis Weeks
|
|
Recommended Award To:
|
Pacific Power Service Corp
|
| |
1801 Walters Ct Fairfield, CA 94533 |
|
Comments:
|
The contract was Awarded to:
Pacific Power Service Corp
|
|
RFP
03-20: Paratransit Business Model Study
|
|
Recommended Award Date: |
Dec 03, 03 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
Nelson\Nygaard Consulting Associates
|
| |
785 Market Street, Suite 1300 San Francisco, CA 94103 |
|
Comments:
|
This project shall be awarded to Nelson\Nygaard Consulting Associates.
|
|
IFB
03-591-P15: Diesel 500KW Generator or Retrofit existing Generator
|
|
Recommended Award Date: |
Oct 27, 03 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
Peterson Power Systems
|
| |
2828 Teagarden St. San Leandro, CA 94577 |
|
Comments:
|
This serves as notice that VTA intends to issue a contract to Peterson Power Systems as the lowest responsive responsible bidder. Any award is contingent on VTA Management and Board approval when required. While there is no guarantee of approval it is anticipated that an award will be made October 17, 2003.
|
|
IFB
VTA03-594-P05: Janitorial Supply and Housekeeping Services
|
|
Recommended Award Date: |
Oct 24, 03 |
|
Administrator:
|
Dan Collins
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Notice of Recommended Award:
The Samta Clara Valley Transportation
Authority Staff will recommend that its
Board of Directors award this contract
to Tri-City Maintenance the lowest responsive and responsible bidder. While there is no quarantee of approval,
it is anticpated that an award will be made on 12/4/2003.
Addendum #1 Issued 10/09 and faxed
to all Pre-bid conference participants
The Santa Clara Valley Transportation Authority will receive sealed bids until
Thursday October 23, 2003 for the furnishing of janitorial supply and housekeeping services as further detailed in the contract documents. A mandatory pre-bid conference will be held on Wednesday 10-8-03 at 10:00 a.m..Please contact Contract Administrator to confirm attendance. Bids will be received by the Contracts and Materials Management Office at 3331 North First Street Building A San Jose, California 95134-1906 C ontract documents may be downloaded or obtained and examined at this address.
|
|
IFB
M03071: CCTV/Access Control Maintenance
|
|
Recommended Award Date: |
Oct 23, 03 |
|
Administrator:
|
Travis Weeks
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
The contract was Awarded to:
RFI Communications & Security Systems
|
|
IFB
03-586-p15: Fasteners, Electrical Terminals and Miscellaneous Items
|
|
Recommended Award Date: |
Sep 22, 03 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
Barnes Distribution
|
| |
541 W Juana Ave San Leandro, CA 94577 |
|
Comments:
|
This serves as notice that VTA intends to issue a contract to Barnes Distribution (Bowman) as the lowest responsive and responsible bidder. Any award is contingent on VTA Management and Board approval when required. While there is no guarantee of approval, it is anticipated that an award will be made on 20, 2003.
|
|
IFB
03064: Chaboya Building A Dispatch Carpet Removal
|
|
Recommended Award Date: |
Sep 05, 03 |
|
Administrator:
|
Travis Weeks
|
|
Recommended Award To:
|
Avalon Construction Company
|
| |
5165 3rd Street San Francisco, CA 94124 |
|
Comments:
|
Contract Awarded to Avalon Restoration Inc. 5,784.00.
|
|
IFB
03060: Slurry Seal & Re-Strip Guadalupe
|
|
Recommended Award Date: |
Aug 26, 03 |
|
Administrator:
|
Travis Weeks
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract Awarded Low Bidder Re-New Construction at $45,000.00.
|
|
RFP
03-12: Information Technology (IT) Professional Services
|
|
Recommended Award Date: |
Aug 07, 03 |
|
Administrator:
|
Ephraim Cadaing
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
The following firms were selected for this RFP:
Bay Area Learning Centers;
Bd Systems, Inc.;
Booz Allen Hamilton;
BrightStar Information Technology Services, Inc.;
Business Information Solutions, LLC,;
Center for Project Management;
Company 39, Inc.;
Covansys Corporation;
EZ Commerce Global Solutions, Inc.;
F1 Consulting, Inc.;
Macro Corportation;
Modis, Inc.;
Nexlevel Information Technology, Inc.;
R Systems, Inc.
|
|
RFP
03-03: Value Engineering & Peer Review for SVRT
|
|
Recommended Award Date: |
Aug 01, 03 |
|
Administrator:
|
Camille Williams
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Proposers will now need to submit a pre-proposal submittal outlining their Team which VTA will evaluate to determine if there is a Conflict of Interest. This pre-proposal is due by April 30, 2003, 5:00 PM. Proposals will now be due by 5:00 PM, May 28, 2003.
|
|
IFB
C236 03001: Capitol Park & Ride Lots And Parking Facilities
|
|
Recommended Award Date: |
Jun 19, 03 |
|
Administrator:
|
Travis Weeks
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
This project Bid Opening April 22,2003-Bldg.A-A109-2:00P.M.
The Apparent Low Bidder is O.C Jones & Son, Inc. at 1,791,518.50, the subcontracts listed are: R&W. Concrete,Concrete/Lonestar Landscape,Landscape-Irrigation/Reiable Tree Experts,Tree Removal/KCK Builders,Operator Facility/MJB Pipline,Underground/Central Fence Co.,Fencing/ and Signal Electric,Electrical.
|
|
IFB
VTA03-575-P05: Janitorial/Cleaning Supplies
|
|
Recommended Award Date: |
Jun 18, 03 |
|
Administrator:
|
Dan Collins
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Final award to Advantage Janitorial Supply Co.Inc.
Notice of Recommended Award:
The Santa Clara Valley Transportation Authority Staff will recommend that its
General Manager award the above referenced contract to Advantage Janitorial Supply Co.Inc., the lowest responsible and responsive bidder.
Invitation for Bid #VTA03-575-P05 for
the supply of janitorial/cleaning supplies. Please contact buyer to request copy of the contract documents.
|
|
RFP
03-14: Long Distance Telephone Services
|
|
Recommended Award Date: |
Jun 10, 03 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
SBC California/Pacific Bell
|
| |
1550 Leigh Ave. San Jose, CA 95125 |
|
Comments:
|
Contract awarded to: SBC California/Pacific Bell
|
|
IFB
03013: North Division Completion Project
|
|
Recommended Award Date: |
Jun 09, 03 |
|
Administrator:
|
Sunni Gunawardena
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
The project consists of construction and completion of Fuel Island (app. 2520 sf), Bus Washing Facility (app.7840 sf), Waste Water Treatment Plant, Tire/Detail and Inspection Shop (app. 10,600 sf), Compactor Room (app. 1000 sf), Compactor Room (app. 1000 sf), paving, site lighting and sports courts. Value 2.5M to 3.5M. Plans & Specs will be available early April. Projected Pre-Bid conference & Bid dates listed above. Construction to commence late June 2003. Pre-qual dead line 3/25/03. Pre-Bid/Site Tour (STRONGLY RECOMMENDED) will be held at 1325 LaAvenida, Building A, Room 103, Mt. View, CA 94043
SECOND SITE TOUR WILL BE HELD AT THE SAME LOCATION ON 4/28/03 AT 10.00 AM.
Notice of Award-Vitton Construction.
|
|
RFP
03-10: Paratransit Eligibility Appeals Vendor
|
|
Recommended Award Date: |
Jun 05, 03 |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract Awarded to NovaCare Rehabilitation of California.
|
|
IFB
M03019: Pavement Repairs at Chaboya Div.
|
|
Recommended Award Date: |
May 15, 03 |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
This project consists of excavating and replacing asphalt concrete at Chaboya Bus Division located in San Jose. Contract Documents can be obtained by calling (408)321-7199; no deposit required.
Pre-Bid/Walk-through to be held 4/1/03. Bid Opening scheduled for 4/25/03.
VTA has issued its Notice of Recommended Award to El Camino Paving.
|
|
RFP
03-09: Paratransit Eligibility Certification Program
|
|
Recommended Award Date: |
May 01, 03 |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract Award to Orthopaedic Hospital
|
|
IFB
M03018: Door Maintenance & Repair
|
|
Recommended Award Date: |
May 01, 03 |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA Board of Directors approved the award to Industrial Door Service.
|
|
IFB
02181: Capitol Site Restoration Rebid
|
|
Recommended Award Date: |
Apr 04, 03 |
|
Administrator:
|
Travis Weeks
|
|
Recommended Award To:
|
Bianchi-Amaker Construction
|
| |
775-A Mabury Road San Jose, CA 95133 |
|
Comments:
|
Bid Opening - 2:00 p.m.-A108-2/27
The Apparent Low Bidder is George Bianchi Construction, Inc. at $424,031.50. The Subcontractor AC Curbs,Quality Striping,A&G Automatic Gate & Access, Patania Masonry,Colony Landscape.
This contract consist of the following major items including all things necessary to complete the work: The contract is to restore the Capitol Avenue frontage of private properties changed by the preceding civil work and street improvements contract. The major items of work include placing landscaping, restoring or installing new irrigation systems, placing concrete pathways, concrete stairway, CMU decorative wall, fencing, and lighting.
|
|
IFB
ITQ03-05-P15: Sale of Excess Filter Inventory
|
|
Recommended Award Date: |
Mar 31, 03 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA is accepting quotations for the sale of excess oil, air, & AC system filters. The primary applications for these items are Detroit Diesel, Allison Transmission and Thermo King.
|
|
IFB
VTA02-571-P05: HVAC UNITS REPLACEMENT PROJECT
|
|
Recommended Award Date: |
Feb 20, 03 |
|
Administrator:
|
Dan Collins
|
|
Recommended Award To:
|
N.V. Heathorn, Inc.
|
| |
1155 Beecher Street San Leandro, CA 94577 |
|
Comments:
|
Final Award To Vendor Shown
Notice Of Recommended Award: The Santa
Clara Valley Transportation Authority
staff intends to award this project to
N.V. Heathorn, Inc. the lowest responsible and responsive bidder.
Notice:Addendum #2a posted 1/10/03
which supercedes and replaces addendum
#2
Notice: Addendum #2 to be posted this week. Bid due date to be extended to 1/17/03.
Addendum #1 posted 12/23/02
VTA is soliciting bids for the replacement of 3 industrial air
conditioners per the bid specifications.
|
|
RFP
RFQ 02-16: REAL ESTATE TITLE COMPANIES & ESCROW SERVICES
|
|
Recommended Award Date: |
Jan 10, 03 |
|
Administrator:
|
Camille Williams
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA is requesting proposals from firms for Real Estate Title Companies and Escrow Services for Various Facilites, Highways and Rail Projects.
|
|
RFP
02-20: Industrial Hygiene & Safety Consulting
|
|
Recommended Award Date: |
Dec 20, 02 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
IHI Environmental
|
| |
1260 45th Street Suite L Emeryville, CA 94608-2907 |
|
Comments:
|
Awarded to: IHI Environmental.
|
|
IFB
02144: Santa Clara Caltrain Transit Center & Parking Expansion
|
|
Recommended Award Date: |
Dec 19, 02 |
|
Administrator:
|
Travis Weeks
|
|
Recommended Award To:
|
O.C. Jones & Sons, Inc.
|
| |
1520 4th Street Berkeley, CA 94170 |
|
Comments:
|
Bid Opening was held December 10,2002 2:00pm A103
The Apparent low bidder was O.C.Jones & Sons Inc. at 740,168.00
The Subcontractors listed by O.C.Jones are:Olivera Fence,Fencing/KCK Builders,Transit Shelter/Herzer Landscape,Landscaping/MJB Pileline,Underground/Heim Bros.,Building Demo./KMA Concrete,Concrete/Cupertino Electric,Electrical/Online Striping,Striping.
If you have any questions, please call Travis Weeks at 408-952-8979.
|
|
RFP
02-18: Software Training Classes
|
|
Recommended Award Date: |
Dec 10, 02 |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
Computer Training Resources
|
| |
2005 De La Cruz Ave. Santa Clara, CA 95050 |
|
Comments:
|
This project shall be awarded to Bay Area ExecuTrain (formerly Computer Training Resources)
|
|
RFP
02-09: Wheel / Rail Interface Study
|
|
Recommended Award Date: |
Dec 06, 02 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract awarded to: National Research Council of Canada (NRCC)
|
|
IFB
VTA02-569-P05: TRAIN TO WAYSIDE COMMUNICATIONS (TWC) SYSTEM
|
|
Recommended Award Date: |
Nov 20, 02 |
|
Administrator:
|
Dan Collins
|
|
Recommended Award To:
|
Advanced Railway Concepts
|
| |
211 University Avenue Arlington Heights, IL 60004-1809 |
|
Comments:
|
Awarded to: ADVANCED RAILWAY CONCEPTS USA INC.
Notice of Recommended Award:
This serves as notice that the Santa Clara Valley Transportation Authority
intends to issue a contract to AR Concepts USA,Inc., the lowest responsive and responsible bidder. Any award is contingent upon managemnet approval. Posted 11/12/02.
Addendum #1 has been posted today 11/01/02.
VTA Seeks bids from responsible bidders for the supply of a train to wayside communications system. The System consists of a 19" rack, a power supply,
an interrogator,etc.(see contract documents.
|
|
IFB
02027: ROUTE 85/101 (NORTH) INTERCHANGE PROJECT
|
|
Recommended Award Date: |
Nov 12, 02 |
|
Administrator:
|
Surinder Singh
|
|
Recommended Award To:
|
FCI Constructors
|
| |
2100 Goodyear Road Benicia, CA 94510 |
|
Comments:
|
The work consists of reconstruction and reconfiguration of the Route 101 interchanges with Moffett Blvd., Route 85, Shoreline Blvd and old Middlefield Way. Five (5) new structures will be built, One (1) bridge widened, roadways widened, significant Mechanically Stabilized Embankment (MSE) walls constructed,and two(2) bridges will be removed. MSE wall panels contain special architectural treatment, as do bridge columns.
|
|
IFB
02092: Elevator & Esalator Maintenance
|
|
Recommended Award Date: |
Sep 24, 02 |
|
Administrator:
|
Travis Weeks
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Vertran is the apparent low bidder at 261,900.00
|
|
IFB
02071: Guadalupe Escalator Retrofit
|
|
Recommended Award Date: |
Sep 20, 02 |
|
Administrator:
|
Sunni Gunawardena
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Installation of escalator skirt deflection brushes for 11 escalators at the Guadalupe Light Rail stations.
Notice of Award-Vertrans Inc.
|
|
IFB
Contract 02023: ROUTE 237/880 INTERCHANGE PROJECT-STAGE C, PHASE II
|
|
Recommended Award Date: |
Sep 12, 02 |
|
Administrator:
|
Surinder Singh
|
|
Recommended Award To:
|
RGW Construction
|
| |
550 Greenville Road Livermore, CA 94550 |
|
Comments:
|
The project consists of constructing HOV direct connector ramps from southbound I-880 to westbound SR-237 and eastbound SR-237 to northbound I-880. Furthermore, a braided ramp will be constructed between Route 237 and the Tasman Drive Interchange to separate the eastbound Route 237 to southbound I-880 freeway-to-freeway connector from the southbound I-880 off-ramp to Tasman Drive.
|
|
IFB
VTA02-539: PORTABLE TOILETS
|
|
Recommended Award Date: |
Sep 12, 02 |
|
Administrator:
|
Dan Collins
|
|
Recommended Award To:
|
National Construction Rentals
|
| |
15319 Chatsworth St. Mission Hills, CA 91345 |
|
Comments:
|
Awarded to National Construction Rentals Inc.
|
|
IFB
02-560-P15: SB 989 UndergroundFuel Tank System Testing
|
|
Recommended Award Date: |
Sep 10, 02 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
Clean Fuels, Inc.
|
| |
2929 Vail Avenue Suite 200 Los Angeles, CA 90040 |
|
Comments:
|
This serves as notice that the Santa Clara Valley Transportation Authority intends to issue a contract to CLEAN FUELS as the lowest responsive and responsible bidder. Any award is contingent on VTA Management and Board approval when required. While there is no guarantee of approval it is anticipated that an award will be made on September 10, 2002.
|
|
RFP
02-10: INFORMATION TECHNICAL AND SPECIALIZED SERVICES
|
|
Recommended Award Date: |
Sep 05, 02 |
|
Administrator:
|
Ephraim Cadaing
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA seeks proposals from qualified technology consulting firms to provide Information Technical and Specialized Services to support VTA's Information Technology Group on an as needed basis.
|
|
IFB
VTA 02-556-P15: Wheel Alignment Service for Buses
|
|
Recommended Award Date: |
Aug 29, 02 |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
d.ross equipment repair
|
| |
852 n. 10th st san jose, CA 95112 |
|
Comments:
|
This serves as notice that VTA intends to issue a contract to Ross Equipment Repair as the lowest responsaive, responsible bidder. Any award is contingent on VTA Management and BOard approval when required. While there is no guarantee of approval it is anticipated that an award will be made on September 9, 2002.
|
|
RFP
02-08: Managing Utility Conflicts For Various Projects
|
|
Recommended Award Date: |
Aug 09, 02 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA staff will recommend award of a contract to So-Deep, Inc.; SafeProbe, Inc.; TBE Group, Inc.; and BayState Subsurface Investigation, Inc. at the 10/10/02 Board Meeting.
|
|
IFB
02009: CAPITOL LRT STATIONS
|
|
Recommended Award Date: |
Aug 08, 02 |
|
Administrator:
|
Tony Galam
|
|
Recommended Award To:
|
Robert A. Bothman, Inc.
|
| |
650 Quinn Ave San Jose, CA 95112 |
|
Comments:
|
Apparent Low Bidder, Robert A. Bothman
Bid Amount $4,671,482.00.
|
|
IFB
02049: Stations & Park and Ride Lots (I880 to Hostetter)
|
|
Recommended Award Date: |
Aug 06, 02 |
|
Administrator:
|
Travis Weeks
|
|
Recommended Award To:
|
O.C. Jones & Sons, Inc.
|
| |
1520 4th Street Berkeley, CA 94170 |
|
Comments:
|
O.C.Jones and Sons is the apprent low bidder. The following is a list of subcontractors submitted by O.C. Jones & Sons Inc.
Stoloski & Gonzalez/Underground, Lonestar Landscape/ Landscaping, KCK/Operator Facility,
R&W Concrete/Site & Platform Concrete,
Bay Area Concrete/Coloring,
Jones Bros./Concrete Ret. Walls, GTE Metal Erectors/Structural Steel, Elcor Electric/Electrical, CNC Painting/Painting, West Pac Arch Glass/ Glazing, Allied Fire Protection/Fire Protection System, and O'Keeffe's Inc./Sky Lights
|
|
RFP
02-06: Right of Way Engineering & Surveying Services
|
|
Recommended Award Date: |
Aug 02, 02 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
Towill, Inc
|
| |
5099 Commercial Circle Suite 100 Concord, CA 94520 |
|
Comments:
|
Contract awarded to Towill, Inc.; Psomas; and HMH, Inc. 08/02/02
|
|
RFP
01-22: Light Rail Design Support Services
|
|
Recommended Award Date: |
Aug 01, 02 |
|
Administrator:
|
Garth Kwiecien
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
PGH Wong Engineering, Inc. was award this Agreement at VTA's August 1, 2002 Board of Directors Meeting.
|
|
IFB
02052: GENERATOR RELOATION PROJECT P-0418
|
|
Recommended Award Date: |
Jul 08, 02 |
|
Administrator:
|
Charles James
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Relocate 500kw generator from North Yard to Chaboya Yard. Install concrete pad, install 12 amp automatic load transfer switch, trench and install cables as required
|
|
IFB
02024: SB ROUTE 17 HAMILTON AVENUE EXIT RAMP PROJECT
|
|
Recommended Award Date: |
Jun 21, 02 |
|
Administrator:
|
Surinder Singh
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
The project consists of widening the SB Route 17 Hamilton Avenue off ramp. The widening will take place on the west side of the off ramp to allow for the right-turn movement to get trhough the bottleneck.
|
|
IFB
02025: ROUTE 152 IMPROVEMENTS - PROJECT A, PHASE 1
|
|
Recommended Award Date: |
Jun 21, 02 |
|
Administrator:
|
Surinder Singh
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
The project consists of the widening of Route 152 from the Route 101 Separation to just east of Millers Slough to provide two lanes in each direction. It includes the construction of a temporary signal and a permanent signal & lighting.
|
|
IFB
02022: Consolidated Biological Mitigation Project - Phase II
|
|
Recommended Award Date: |
Jun 21, 02 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
This solicitation is closed.
|
|
RFP
02-02: Real Estate Appraiser Expert Witness Services
|
|
Recommended Award Date: |
Jun 06, 02 |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
List of firms will be recommended for contract award at Board meeting June 6, 2002.
|
|
IFB
02060: ROUTE 152 IMPROVEMENTS - SIGNAL POLE PROCUREMENT
|
|
Recommended Award Date: |
Jun 05, 02 |
|
Administrator:
|
Surinder Singh
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
The project consists of signal and lighting procurement including all equipment necessary to complete the work involved in the manufacture, fabrication, inspection, sampling and testing, certification, shipping and unloading.
|
|
RFP
02-04: Industrial Hygiene & Safety Consulting
|
|
Recommended Award Date: |
Apr 19, 02 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract awarded to: Clayton Group Services, Inc.
|
|
IFB
01117: Civil, Segment 1, WozWay to San Jose Diridon Station
|
|
Recommended Award Date: |
Mar 08, 02 |
|
Administrator:
|
Tony Galam
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Apparent low bidder is R & L Brosamer.
|
|
IFB
01210: Meridian, Kingman, Rte 17
|
|
Recommended Award Date: |
Mar 07, 02 |
|
Administrator:
|
Tony Galam
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Complete Title: Meridian, Kingman, Rte 17 Undrpss
& Hamilton Ave At-Grade. Note: this is the second of two contracts, the other Contract C346 (01104)released on Dec 17, 2001, involves an overcrossing; only one of these contracts will be awarded.
|
|
IFB
01104: Meridian, Kingman, Route 17
|
|
Recommended Award Date: |
Mar 07, 02 |
|
Administrator:
|
Tony Galam
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Complete Title is: Meridian, Kingman, Route 17 Underpass and Hamilton Ave Overcrossing.
Note; this is the first of two contracts, the other Contract C347, Hamilton Ave At-Grade will be released on December 28, only one of these contracts will be awarded.
|
|
RFP
01-44: Drug Testing Laboratory Services
|
|
Recommended Award Date: |
Mar 05, 02 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract awarded to: Quest Diagnostics
|
|
RFP
01-19: Artistic Services
|
|
Recommended Award Date: |
Mar 01, 02 |
|
Administrator:
|
Garth Kwiecien
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA' Board of Directors had approved nine artist for 11 projets. Te remaining three projects will be present for approval at its October 10, 2002 meeting.
on February 7, 2002. 14 Artist were selected for 16 projects located within the Cities of San Jose and Milpitas, CA.
|
|
IFB
VTA01514P05: FIRE SUPPRESSION SYSTEMS OCC
|
|
Recommended Award Date: |
Feb 12, 02 |
|
Administrator:
|
Dan Collins
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Award of bid is recommended to Life Safety Engineering as the lowest responsive, responsible vendor.
|
|
IFB
01086: Route 85/101 South Interchange Project
|
|
Recommended Award Date: |
Feb 11, 02 |
|
Administrator:
|
Surinder Singh
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Constructing High-occupancy vehicle lane direct connector ramps from northbound (NB) U.S. 101 to NB Route 85 and from SB Route 85 to SB U.S. 101. This project provides for the construction of a mixed-flow connector from SB U.S. 101 to NB Route 85.
|
|
IFB
00155: LRV Facilities Expansion: New Parts Building 'K'
|
|
Recommended Award Date: |
Jan 11, 02 |
|
Administrator:
|
Trace Bonney
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Award has been made to EA Davidovits, Inc
|
|
RFP
01-33: Development of a Desktop Procedures Manual
|
|
Recommended Award Date: |
Jan 07, 02 |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract executed with cdCrouse Consultants effective 1/07/2002.
|
|
IFB
01212: PLUMBING SERVICES, MAINTENANCE & REPAIRS- ALL VTA FACILITIES
|
|
Recommended Award Date: |
Jan 06, 02 |
|
Administrator:
|
Hina Patel
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
CONTRACTORS LICENSE: C-36
Recommended award to Burr Plumbing
|
|
IFB
01196: Tasman Corridor Project-Fire Station #23 Modification
|
|
Recommended Award Date: |
Jan 06, 02 |
|
Administrator:
|
Tony Galam
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Plans are available in the lobby of Bldg A for $50.00
|
|
RFP
01-28: Cultural Resource Services
|
|
Recommended Award Date: |
Jan 01, 02 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Selected Firms:
Basin Research Associates
Far Western Anthropological Research Group
|
|
RFP
01-38: Light Rail Shuttle Service
|
|
Recommended Award Date: |
Dec 20, 01 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract awarded to: New Century Transportation
|
|
IFB
01083: NB RT17 AUX LANE-R85 & CAMDEN
|
|
Recommended Award Date: |
Dec 17, 01 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract awarded to RGW Construction, Inc.
|
|
IFB
01171: Maintenance at Cerone and River Oaks
|
|
Recommended Award Date: |
Nov 27, 01 |
|
Administrator:
|
Sunni Gunawardena
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Repair road access at Cerone and River Oaks
|
|
RFP
01-31: Operations Insurance Broker Services
|
|
Recommended Award Date: |
Nov 01, 01 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract awarded to: Robert F. Driver Company, Inc.
|
|
RFP
01-027: Biological Resource Services
|
|
Recommended Award Date: |
Nov 01, 01 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Selected firms: H.T. Harvey & Associates, Jones & Stokes Associates
|
|
IFB
01113: ADA LRT Station Signage
|
|
Recommended Award Date: |
Oct 12, 01 |
|
Administrator:
|
Sunni Gunawardena
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Notice of Award issued to George Bianchi Construction Inc.
|
|
RFP
01-18: Strategic Marketing and Creative Services
|
|
Recommended Award Date: |
Oct 11, 01 |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract awarded to Plan B to Board of Directors on October 11, 2001.
|
|
RFP
01-020: Software Data Extraction Tool (RTL)
|
|
Recommended Award Date: |
Oct 11, 01 |
|
Administrator:
|
Olga Medina
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Reommended Award to BASE Consulting Group
Board will vote on October 11, 2001
|
|
IFB
01138: Cerone Minor Maintenance Overhead Safety Restraint System
|
|
Recommended Award Date: |
Oct 10, 01 |
|
Administrator:
|
Sunni Gunawardena
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Notice of Reccommended Award issued to PICC Inc.
|
|
IFB
01164: Re-paint Children,s Discovery Museum LRT Station
|
|
Recommended Award Date: |
Oct 03, 01 |
|
Administrator:
|
Sunni Gunawardena
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Notice of Award issued to Able Painting Construction Co.
|
|
RFP
01-029-P05: Safety Shoes RFP
|
|
Recommended Award Date: |
Sep 25, 01 |
|
Administrator:
|
Dan Collins
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
See the solicitation documentation for full details.
|
|
RFP
01-25: Strategic Plan and Gateway County Telephone Surveys
|
|
Recommended Award Date: |
Sep 06, 01 |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Awarded to Godbe Research and Analysis
|
|
IFB
01033: Traction Power Substations Procurement
|
|
Recommended Award Date: |
Sep 06, 01 |
|
Administrator:
|
Tony Galam
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Awarded to: IMpulse NC, Inc
|
|
IFB
01003: Civil, Segment 2, San Jose Diridon Station to Winchester Station
|
|
Recommended Award Date: |
Sep 06, 01 |
|
Administrator:
|
Tony Galam
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Awarded to: Stacy & Witbeck
|
|
RFP
01-14: 2001 Traffic Monitoring and Conformace Report
|
|
Recommended Award Date: |
Sep 06, 01 |
|
Administrator:
|
Donald Kimerer
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Awarded to Dowling Associates, Inc
|
|
IFB
01010: Route 17 Restriping between Route 280 and Hamilton Avenue
|
|
Recommended Award Date: |
Aug 10, 01 |
|
Administrator:
|
Surinder Singh
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
See the solicitation documentation for full details.
|
|
IFB
01002: Tasman East Site Restoration (Phase 1)
|
|
Recommended Award Date: |
Aug 03, 01 |
|
Administrator:
|
Tony Galam
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Awarded to: Blossom Valley Construction, Inc
August 3, 2001
|
|
IFB
01115: Route 237/880 Interchange Stage C, Phase 1 (Rebid)
|
|
Recommended Award Date: |
Aug 02, 01 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Awarded to: RM Harris Co., Inc
August 2, 2001
|
|
IFB
01085: Coyote Creek Channel Realignment-85/101 South
|
|
Recommended Award Date: |
Aug 02, 01 |
|
Administrator:
|
Surinder Singh
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Awarded to: HSR, Inc
August 2, 2001
|
|
IFB
01084: Biological Mitigation, Phase 1-Arundo Donax Removal
|
|
Recommended Award Date: |
Aug 02, 01 |
|
Administrator:
|
Patty Ferguson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Awarded to: Aquatic Environments, Inc
August 2, 2001
|
|
IFB
01082: Route 85/87 Interchange
|
|
Recommended Award Date: |
Aug 02, 01 |
|
Administrator:
|
Surinder Singh
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Awarded to: FCI Constructors, Inc
|
|
IFB
01080: Route 101 Widening Project
|
|
Recommended Award Date: |
Aug 02, 01 |
|
Administrator:
|
Surinder Singh
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Awarded to: RGW Construction
August 2, 2001
|
|
RFP
01-15: Commuter Rail Design Support Services
|
|
Recommended Award Date: |
Aug 02, 01 |
|
Administrator:
|
Trace Bonney
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Awarded to: DMJM+Harris
|
|
RFP
01-07: Salary Data Conversion
|
|
Recommended Award Date: |
Aug 02, 01 |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
This contract has been awarded to
National Business Systems.
|
|
RFP
01-021: VTA Bus & Rail Map and Shelter Maps
|
|
Recommended Award Date: |
Jul 27, 01 |
|
Administrator:
|
Olga Medina
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract has been awarded to Reineck & Reineck
|
|
IFB
03059: Slurry Seal and Re-Stripe 8 Park and Ride Lots
|
|
Recommended Award Date: |
Sep 03, 00 |
|
Administrator:
|
Travis Weeks
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract Awarded to Bond Blacktop Inc.
|
|
IFB
VTA06-503-P05: Fire Extinguisher Service
|
|
Recommended Award Date: |
Apr 04, 00 |
|
Administrator:
|
Dan Collins
|
|
Recommended Award To:
|
Cintas Fire Protection
|
| |
2188 Del Franco St San Jose, CA 95131 |
|
Comments:
|
Awarded to Beacon fire and Safety.
|
|
IFB
C610 (11088F): Water, Storm, and Sewer Utility Relocation At Piper Drive
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Travis Weeks
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Addendum #1 was issued October 03, 2011
|
|
IFB
C11058F: A230 - 42-Inch Steel Waterline Procurement
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Travis Weeks
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
The scope of work consists of furnishing all labor, methods or processes, implements, tools, machinery, materials of any kind for the Santa Clara Valley Water District's (SCVWD’s) 42-inch Milpitas Pipeline waterline in Piper Drive in Milpitas, California. It consists of the following:
1. 900 feet of 42-inch steel pipe.
2. 2(Two) Combination Air Release Valve Assemblies.
3.2 (Two) 70 feet and 1 (One) 14 feet of 60-inch steel casings.
4.Other associated materials required to complete installation complete in place.
5.Delivered at or near the site and placed at a location to be determined by VTA.
|
|
RFP
2010: SAVE THE DATE - Information Forum
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Trish Kane
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
This solicitation is closed.
Second notice Design Build Information Forum attached. 8/25/2010
This notice contains information about VTA's Information Forum. Please "SAVE THE DATE" for the BART Silicon Valley Berryessa Extension Project - Design Build Contract Information Forum on September 30, 2010.
This notice is not the RFQ or RFP for this project. Ongoing updates regarding this forum will be provided.
|
|
RFP
10-06: Transit Shelter Advertising Program
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
No award will be made as a result of this RFP. VTA has rejected all proposals.
|
|
RFP
10-08: Technology General Consulting Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Carolyn Vargas
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA is seeking proposals from qualified firms to provide consulting services in the following areas: SAP Support Services, General Programming Services, Distributed User Technical Support, Information Technology (IT) Infrastructure Support, Web Development, Web Portal/SharePoint Development Services, Technology Training Services, Intelligent Transit Systems (ITS) Support Services, Technology Communication Services and Fare Collection Technology Services.
|
|
RFP
10-03: On-Call Systems Engineering Design Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Mae Ma
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
2/5/10 Addendum No.1 has been posted. Proposers must sign & submit with proposals.************************
VTA seeks proposals from qualified firms to provide On-Call Systems Engineering Design Services.
|
|
RFP
RFQ09-04: On-Call BRT Planning and Design Engineering Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Trish Kane
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
March 19, 2009: Interviews. VTA will not conduct interviews for this solicitation. Due to the significant interest in this RFQ the shortlist will not be available until further notice.
|
|
RFP
RFQ09-01: On-Call Transit Planning Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Trish Kane
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
3/20/2009 - Interviews will not be held for this solicitation. We anticipate a final "shortlist" by Friday, March 27th.
|
|
RFP
RFP 07-16: 457 Deferred Compensation Plan Cosultant Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Trace Bonney
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA seeks proposals for Deferred Compensation Consultant Services. Interested parties should download the attached document.
|
|
RFP
RFP 07-05: Aerial Photography, Right of Way Engineering & Survey Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Michael Galbo
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Provide photogrammetric, right of way engineering, and survey services for various facilities, real estate, highway and rail projects in conformance with the appropriate VTA, Caltrans, BART or local agency standards applicable to each project.
|
|
IFB
RFP 07-02: Employee Assistance Program
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Michael Galbo
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Please do not response to this email.
|
|
RFP
06-08: Operator Training
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA is accepting proposals from qualified vendors for Transit Vehicle & Truck License Training and Certification Program.
|
|
RFP
06-10: Planning Services: General Plan Amendments & Permit Processing
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA is seeking firms qualified to be responsible for all aspects of coordination and planning services requried to complete and process City applications for general plan amendment and zoning changes to permit transit-oriented development on VTA-owned sites.
|
|
RFP
06-09: Investment Consulting Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Olga Medina
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA seeks proposals from qualified firms to provide Investment Consulting Services.
|
|
RFP
06-07: IT, Engr., High Voltage Elect Recruitment
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Olga Medina
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA seeks proposals from qualified firms to provide Information Technology, Engineering, and High Voltage Electrical personnel Recruitment.
|
|
RFP
06-06: Executive/Administrative Recruitment
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Olga Medina
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA seeks proposals from qualified firms to furnish Executive/Administrative Recruitment.
|
|
RFP
06-05: Operations Management Recruitment
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Olga Medina
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA seeks proposals from qualified firms to furnish operations management services.
|
|
RFP
06-13: HOT Lane Demonstration Project
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA seeks proposals from qualified firms to provide a work plan that will result in a recommendation of a High Occupancy Toll (HOT) Lane Demonstration Project.
|
|
RFP
RFP 05-16: HIGHWAY PROGRAM PLANNING AND ENGINEERING DESIGN SERVICES
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Trace Bonney
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
please download the file named RFP 05-16zip. the other file is defective.
|
|
IFB
C670 (05001F): Card Interface Device Site Preparation Project
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Travis Weeks
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
The Advertising for this project has been moved to eBoidboard's web-site.
For future reference please follow the path listed below.
http:www.vta.org
Click on-Procurement
Click on-Solicitations
Click on-eBidboard.com.
|
|
IFB
M05064: System Wide LRT Stations Signage
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Ephraim Cadaing
|
|
Recommended Award To:
|
INPS
|
| |
1420 Crumlin Rd. London, ON N5V 1S1 |
|
Comments:
|
VTA will receive sealed bids from qualified firms to provide signage and necessary hardware for the VTA system wide LRT stations.
****************************************
The apparent Low bidder for IFB M05064 was INPS.
|
|
RFP
05-13: On-Call Native American Monitoring Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Trish Kane
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Addenda No. 1 - The Proposal Due date has been extended to August 11, 2005.
|
|
RFP
RFP 05-09: On Call Structural Engineering Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Camille Williams
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
RFP for On Call Structural Engineering Services. In addition to Structural Engineering Services, proposers shall be prepared to show professional experience and capabilities in Geotechnical, Civil, Electrical, Transportation/Traffic and Landscape Architecture Engineering.
|
|
RFP
RFP 05-10: AUTOMATIC PASSENGERS COUNTERS FOR LIGHT RAIL VEHICLES
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Olga Medina
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
See the solicitation documentation for full details.
|
|
RFP
RFQ 05-06: Request For Qualifications Joint Development Solicitation
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Thomas Smith
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA invites Statements of Qualifications from developers interested in developing one or more of the four Joint Development Sites offered.
|
|
IFB
05032: Route 85 Noise Mitigation (Concrete Grinding)
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Trace Bonney
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Prequal docs are now available. please come and get.
Even if you have prequaled for other projects you need to submit this doc by 5/5/05
|
|
IFB
05007: NB Rt 17 Aux Lane-Camden to Hamilton, PE
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Florante Tanada
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Please do not response to this email.
|
|
RFP
05-07: Technology General Consulting Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Please disregard this notice.
THIS RFP IS CLOSED.
|
|
IFB
05003: Rt880 Widening Highway Planting (Rebid)
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Trace Bonney
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
See the solicitation documentation for full details.
|
|
IFB
04081: ADA/Pavement Improvements Phase III
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Chris Valle
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
The work consists of pavement improvements and passenger access improvements at six existing bus stops in Santa Clara County. The bus stop improvements are all located in the City of San Jose. The work also includes installation of fencing, handicap curb ramp, sidewalk, and crosswalk striping at the Great Mall Transit Center in the City of Milpitas
|
|
IFB
04069: Rt 152 Improvements-Project B Phase 1
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Trace Bonney
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Plans and Specs will be available on 10/14.
Prequalification documents for this project are now available. Please contact VTA to receive prequalification documents
|
|
IFB
ITQ06-04-P15: EXCESS_INVENTORY_SALE
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Santa Clara Valley Transportation Authority is offering to the highest bidder new and unused excess inventory spare parts, for retired coaches, in listed lots. All items are sold "as is, where is", F.O.B. San Jose, CA, without any expressed or implied warranty, or guarantee. All sales are final.
|
|
IFB
ITQ-12-P15: REQUEST FOR EXPRESSION OF INTEREST
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
The Santa Clara Valley Transportation is Requesting Expressions of Interest for the Sale of surplus Light Rail Station Platform Wheelchair Lifts.
For detailed information regarding this Request, please contact:
Joe Hveem
Tel: 1-408-321-7141
Fax: 1-408-954-1360
email: joe.hveem@vta.org
|
|
RFP
03-02: Systems Design Consultant Services for the (SVRT) Project
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Camille Williams
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
This is an RFP for Systems Design Consultant Services for the Silicon Valley Rapid Transit Project-Extension of BART to Santa Clara County. The preproposal conference will be held on October 9, 2003 at 3331 North First Street, San Jose, CA. at 9:00 AM.
|
|
IFB
M03076: PM, Repair & Emergency Svc. for Diesel Fueling Systems
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
The Santa Clara Valley Transportation Authority (VTA) will receive sealed bids until 2:00pm on October 14, 2003 for M03076, Preventive Maintenance, Repair and Emergency Service for Diesel Fueling & Monitoring Systems. The work consists of furnishing all labor, tools, materials and equipment necessary to maintain reliable operation of VTA diesel fuel dispensing equipment, aboveground and underground tanks and monitoring equipment and tramway refueling systems.
|
|
RFP
03-01: Design/Const Mgemnt Services/Tunnel Seg&ProjectWide Project Cont
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Camille Williams
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
This RFP is for Design & Construction Management Services for the Tunnel Segment & Project Wide Project Controls Services for the Silicon Valley Rapid Transit (SVRT). The Preproposal Conference is Sept. 9th, 2003; 9:00 AM at 3331 North First Street, San Jose CA, in the Auditorium. Project.Additional/Supplemental Documents available for a Fee, upon request.
|
|
IFB
C600(03041): T-Signal Retrofit Project
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Chris Valle
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Low three Bidders
Republic electric $369,525
George Bianchi $609,376.80
Tennyson Electric $1,438,400
|
|
RFP
03-18: Artistic Services for Santa Clara Transit Center
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Camille Williams
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Please note change in administrator.
VTA is currently reviewing proposals submitted
|
|
RFP
03-17: Artistic Services for
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Camille Williams
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
See the solicitation documentation for full details.
|
|
IFB
M03063: Parking Lot Power Sweeping
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Sunny Drennan
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA staff will recommend that its Board of Directors award to Universal Sweeping Service at the October 2, 2003 board meeting.
|
|
IFB
03043: LRV Trailer Remodeling
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Sunni Gunawardena
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Project Description: Interior Reconfiguration of existing trailer at VTA Guadalupe Division and HVAC and Electrical Modification of existing trailer.
NRA- Pending to PICC Inc.
|
|
IFB
VTA03-06-P15: EXCESS INVENTORY SALE
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Joe Hveem
|
|
Recommended Award To:
|
Hydraulic Electric, Inc.
|
| |
9932 Prospect Ave., bldg 142 Santee, CA 92071 |
|
Comments:
|
VTA is offering to the highest Bidder new and unused excess inventory spare parts for retired RT88 coaches in listed lots.
|
|
IFB
02171: US 101/BAILEY AVENUE INTERCHANGE PROJECT (SEGMENT A)
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Surinder Singh
|
|
Recommended Award To:
|
C.C. Myers, Inc.
|
| |
3286 Fitzgerald Rd. Rancho Cordova, CA 95742 |
|
Comments:
|
Awarded to Granite/CCMeyers joint venture on 3/7/03
|
|
IFB
02163: Noise Mitigation Phase 2
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Tony Galam
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Apparent low bidder is Pencon Corp.
|
|
RFP
02-19: Leveraged Lease Financing - Lessor Arranger
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Olga Medina
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA is seeking proposals from qualified lessor arranger firms interested in implementing a leveraged lease transaction over VTA’s new light rail vehicles manufactured by Kinkisharyo in Osaka, Japan. VTA is under contract with Kinkisharyo for the manufacture of 100 low floor light rail vehicles (the “LRVs”). At present, VTA has accepted delivery of approximately 16 of the LRVs. The remaining LRVs will be delivered at the rate of approximately 3-4 LRVs per month through June 2004. The total procurement cost of the vehicles is $283,249,832.
|
|
IFB
02089: Electrical Systems Maintenance
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Kevin Kelley
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
This maintenance contract is in the process of being reviewed prior to award.
|
|
RFP
02-17: Energy Cost Savings Project
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Olga Medina
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA desires to engage the services of an experienced consultant in the business of power company electric rate analysis and billing methodology under the present California electric deregulation market. The overall goal is to minimize present and future facility expenditures for the usage of electric power.
|
|
RFP
RFQ 02-15: Real Estate Relocation Assistance Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Garth Kwiecien
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA is requesting qualifications for Real Estate Relocation Assistance Services for various Facilities, Highway and Rail Projects
|
|
RFP
RFQ 02-14: Real Estate Acquisition and Eminent Domain Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Garth Kwiecien
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA is requesting Qualifications from firms for Real Estate Acquisition and Eminent Domain Services for various Facilities, Highway and Rail Projects.
|
|
IFB
02096: Tasman East Site Restoration Phase 3
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Tony Galam
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Apparent low bidder, George Bianchi Construction
|
|
RFP
RFP 02-13: DBE Consultant Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Due date for proposals has been extended to Thursday, August 15, 2002 per Addendum #2.
|
|
RFP
02-11: Municipal Finance Counsel Pool
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Olga Medina
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
VTA seeks proposals from qualified firms to serve as Note Counsel, Bond Counsel, Disclosure Counsel, and Lessee Counsel in connection with VTA's issuance of tax exempt municipal bonds, grant anticipation notes, commercial paper and projected leveraged lease transactions on rolling stock, facilities, and qualified technological equipment.
****************************************
Firms Selected: Fulbright & Jaworski; Squire, Sander & Dempsey; Orrick, Harrington & Suttcliffe; and Nossaman, Guthner, Knox & Elliot
****************************************
|
|
IFB
02015: PASSENGER ACCESS IMPROVEMENTS-PHSE 17
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Hina Patel
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
CONTRACTORS LICENSE: CLASS A OR C-8
SBE REQUIREMENTS: NO SPECIFIC GOAL- NSG
|
|
IFB
02037: North Line Stations Retrofit
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Chris Valle
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Apparent low bidder is George Bianchi Construction Inc. $9,388,021.21.
VTA's engineers estimate $7,075,332. Project to be re-bid as 02109 (C630).
|
|
RFP
02-07: Transaction and Use Tax Consulting Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
See the solicitation documentation for full details.
|
|
IFB
02012: Temporary Landings Project
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Tony Galam
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Plans are available for $50.00 from our plans room.
|
|
IFB
02001: Emergency Ops Center at River Oaks Complex
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Charles James
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Install accoridan partitions and associated electrical & HVAC modifications at 3331 N 1st St., San Jose
|
|
RFP
01-43: Training Workshop for Procedure Writing
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Interviews have been conducted and the selection committee is evaluating proposals
|
|
RFP
01-41: Audit Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
See the solicitation documentation for full details.
|
|
RFP
01157: Vasona Field Office-Parking Lot
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Sunni Gunawardena
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Converting an existing parking into a field office.
|
|
IFB
01032: Tasman East - Site Restoration (Phase 2)
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Tony Galam
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Apparent low bidder Valley Crest
|
|
RFP
01-34: Southern Gateway Transportation and Land Use Study
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract executed with HNTB effective 1/11/2002.
|
|
RFP
01-024: Web Content Management Tool
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Olga Medina
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Interwoven, Inc. was selected for this procurement
|
|
IFB
DC146443P05: Rooftop A/C Package unit
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Dan Collins
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
*CANCELLED* ALL BIDS HAVE BEEN REJECTED*
|
|
IFB
01025: Painting Services
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Sunni Gunawardena
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Painting services for VTA Facilities
|
|
RFP
01-21: VTA Bus & Rail Map and Shelter Maps
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract awarded to: Reineck and Reineck
|
|
IFB
01001: Combined Communications and Signals (Negotiated Procurement)
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Trace Bonney
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Proposals are being evaluated.
Recommendation will be made to the Board of Directors on November 1,2001
|
|
RFP
01-16: Project Management Training
|
|
Recommended Award Date: |
See Below |
|
Administrator:
|
Kim Petterson
|
|
Recommended Award To:
|
See Below
|
|
Comments:
|
Contract was executed with Systems Consulting Consortium w/Center for Project Management
|
|
|