U.S. 101 Improvement Project
(I-280/I-680 to Yerba Buena Rd)

Project Overview

This project will construct various mainline and ramp improvements along U.S. 101 between the I-280/I-680 interchange and Capitol Expressway in San Jose.

Objective

The purpose of this project is to reduce traffic congestion and improve safety along the U.S. 101 corridor in east San Jose by eliminating mainline traffic bottlenecks and removing merging and weaving conflicts.

 Map of project

Features

The proposed improvements would:

• Construct an additional lane on southbound U.S. 101 from south of Story Road to north of Capitol Expressway

• Replace the Tully Road over-crossing over U.S. 101

• Reconfigure the U.S. 101/Tully Road interchange

Maintenance of Traffic Flow

For the safety of the public and construction workers, traffic control measures (such as temporary lane closures and detours) will be used as needed. Contractors will be required to make every effort to maintain access and minimize disruptions. The public will be notified before traffic control measures are implemented.

Operations

Construction will be managed by Caltrans. Upon completion, Caltrans will operate and maintain the highway improvements.

Schedule

Construction begins: Early 2010

Construction complete: Summer 2012

Capital Cost/Funding

$63 million: $30 million from the Corridor Mobility Improvement Account (CMIA) and $33 million from the Santa Clara Valley Transportation Authority (VTA), Federal and State Highway Funds and other local sources.

Printable Fact Sheet