Overhead trackway above streetProject Description

This 8.2-mile extension of VTA Light Rail transit begins at the Baypointe Transfer Station, continues east along Tasman Drive from North First Street to I-880, then along Great Mall Parkway and Capitol Avenue, and ends just south of Alum Rock Avenue.

Train track running towards East foothills in distance

Learn about the history of this project.

Review current project contracts.

Review the Executive Summary of the environmental document.

 

 

Tasman East Light Rail Project

Project Cost:   $273.1 million

Funding Source $ (in millions)
1996 Measure B local sales tax  72.5
Federal and state contributions  99.0
City of Milpitas (for Montague Expressway widening)  1.1

Cities of San Jose and Milpitas (for asphalt pavement
overlay on Great Mall Parkway/Capitol Avenue)

 0.5
VTA bond revenue from fund swap  100.0
Total Project Cost $273.1 million

 

 

 

 

 

 

Tasman East Light Rail Extension was planned and built in two segments:

Tasman East Light Rail, Segment One:

Placeholder for bridget structure photo1.9 miles in the median of Tasman Drive between Baypointe Parkway and Alder Drive. 

  • Three stations:
    • Baypointe Transfer Station
    • Cisco Way
    • I-880/Milpitas

 

Tasman East Light Rail, Segment Two:

Placeholder for Light Rail Vehicle at Alum Rock Station photo3.0 miles in the median of Capitol Avenue between Alder Drive and just south of Hostetter Road, including a 7,200-foot bridge structure for grade separation from two freight railroad lines and Montague Expressway.

  • Four stations:
    • Great Mall/Main
    • Montague
    • Cropley  
    • Hostetter

Capitol Light Rail Project

Project Cost: $159.8 million

Funding Source $ (in millions)  
1996 Measure B local sales tax 115.1
City of San Jose (for Montague Expressway widening) 0.09
Santa Clara Valley Water District 1.5
East Side Union High School District 0.3
VTA bond revenue from fund swap 42.0
Total Project Cost $159.8 million

 

 

 

 

 

Capitol Light Rail Segment:

3.3 miles in the median of Capitol Avenue continuing from the end of Tasman East Segment Two to just south of Alum Rock Avenue.

  • Four stations with a future fifth station:
    • Berryessa
    • Penitencia Creek
    • McKee  
    • Gay Avenue (future station pending funding)
    • Alum Rock

 