Santa Clara-Alum Rock BRT Project

 About the Project

The Santa Clara/Alum Rock Bus Rapid Transit Project will provide just over 7 miles of limited-stop rapid transit service from the Eastridge Transit Center to the Arena Station in downtown San Jose using Capitol Expressway, Alum Rock Avenue and Santa Clara Street. The Santa Clara/Alum Rock Project is the first of three lines, followed by the El Camino Real BRT and Stevens Creek BRT.

  • Special Vehicles – Equipped with green technology and comfortable, modern interiors
  • Enhanced Stations – Attractive shelters, passenger amenities and advanced features
  • Dedicated Lane on Alum Rock – East of 34th street BRT vehicles will travel in a dedicated median bus-way, separated from traffic to improve travel time
  • Transit Signal Priority – Traffic signals stay green as the vehicle approaches the inter­section for faster travel time
  • High-Tech Communications – ‘Up-to-the-minute’ information through electronic message signs at stations and wireless capabilities
  • Rapid Boarding – All-door boarding means faster stops
  • Fast, Frequent, Reliable – BRT lines will operate during the peak times with service every 10 minutes

Service would be provided at 11 new stations:

Arena 24th Story
Downtown San Jose King Ocala
City Hall Jackson Eastridge
17th Alum Rock  

Project Cost and Funding

The total cost for the Santa Clara/Alum Rock Bus Rapid Transit Project is $114 million. The Metropolitan Transportation Commission (MTC) allocated $90 million from State Proposition 1B funds specifically for the BRT project. The remaining $24 million needed for the project will be funded through the 2000 Measure A Transit Improvements Program.

Project Schedule

VTA Board approves Environmental Impact Report December 11, 2008
Final Design Spring 2013
Construction Spring/Summer 2014-2016
Project Completion (Anticipated) Summer 2016

Fact Sheet

For more information on the Santa Clara/Alum Rock BRT Project or existing bus and light rail transit services, call VTA Community Outreach at (408) 321-7575, TTY only (408) 321-2330 or email community.outreach@vta.org.

 

August 11, 2015 (Activities Update)

On July 9, 2015, the contractor struck a live gas line on Alum Rock at Ribbs Lane. The gas line was repaired and service restored later that same day. There was no other apparent damage. However, due to this major utility hit and other safety concerns, VTA has directed the contractor to cease all construction activities in the field while VTA and the contractor work to ensure resolution of all safety concerns.

Community safety is VTA’s top priority, and we are working with the contractor to ensure all safety concerns are resolved before resuming construction. During this stand down period, the contractor will continue to maintain a clean and safe construction zone, and maintain the traffic control along Alum Rock Avenue. 

While we understand this prolongs the construction project, community safety is a top priority.  We will continue to update you on the progress and to share a more comprehensive schedule update for you, including a schedule for the installation of the new shelters.

To download this update please select Activites Update, 8-11-15. If you have any questions regarding the Santa Clara-Alum Rock Bus Rapid Transit Project, please contact our information line, 408.321.7575.

June 17, 2015
Construction activities will be diverting traffic to the outside curbside lanes in each direction of E. Santa Clara Street at 24th Street and southbound traffic will also be closed on 24th Street beginning Monday, June 22, 2015. For full details please select the following link: 24th Street Paving.

June 1, 2015
Beginning Wednesday, June 3, crews will be working downtown San Jose on Santa Clara Street, between Firstt and Fifth Streets, to repair potholes.  They will start between First and Second, and work east. Each location will take 2-3 days.  For complete details, please select the attached link: Downtown Pothole Repair

May 26, 2015
The second phase of the final segment scheduled for roadway reconstruction and paving on the north side (westbound) of Alum Rock Avenue begins this evening, Tuesday, May 26, 7pm, through Friday, May 29, 7pm. This segment will take 72 hours, 3 days AND nights. Crews will be working from King Road to just beyond 33rd Street. Complete details of activities are attached in the link: Roadway Reconstruction/Paving.

Driveways will not be accessible by vehicles except for emergency vehicles, pre-arranged with the SJFD. Businesses and residents located on the north side of Alum Rock will be accessible for pedestrians via the sidewalk.  Consider parking on nearby side-streets during this time.

Detours
Northbound/southbound 33rd and 34th streets crossing Alum Rock Avenue, and northbound from Alum Rock Avenue, will be detoured to North King Road.  Please use posted detours.

  • East or westbound Alum Rock to northbound 33rd: continue to King Road, proceed north on King, make a left on St. James, or left on McKee, and left on 33rd.
    • **NOTE: Additional roadway reconstruction/paving at this intersection will continue through Saturday, May 30.
  • East or westbound Alum Rock to northbound 34th: continue to King Road, proceed north on King, make a left on St. James, left on 34th.

The westbound bus stop at Alum Rock & King will have restricted access, and an alternate bus stop will be in place.  Please see the service notice: Westbound Alum Rock @ King for details.

 
May 18, 2015


Roadway reconstruction and paving is nearing completion on the north side of Alum Rock Avenue. The schedule for the final  segment, between King Road and U.S. 101 on the north side of Alum Rock Avenue will be completed in 2 smaller phases. This has been revised to ensure emergency vehicle access, and has been coordinated with the San Jose Fire Department.
 
This week: Tuesday, May 19 through Thursday, May 21, 2015 – DAY WORK ONLY
 
Crews will be working in a short stretch between U.S. 101, west, to just beyond the driveway for the Bacalhau Grill restaurant/1555 Alum Rock Avenue.  They will also be working in front of the driveway located immediately west of 1623 Alum Rock.
 
The following week crews will complete the remainder of the segment Tuesday, May 26, 2015, 7pm.  This segment will take 72 hours, 3 days AND nights, and be complete Friday, May 29, 7pm.  Driveways will not be accessible by vehicles except for those pre-arranged with the SJFD. Please use posted detours.
 
Businesses located on the north side of Alum Rock will be accessible for pedestrians via the sidewalk.
 
A reminder and any detour information will be posted later this week. 

May 15, 2015
Roadway reconstruction and paving continues this weekend, located on the north end of the intersection of Alum Rock Avenue and King Road beginning this evening (Friday, 5/15) and will be complete late tomorrow night, (Saturday, 5/16).
 
Traffic on King Road will be shifted on the north side of Alum Rock, and a Traffic Patrol Officer will be at the intersection to guide traffic and pedestrians.
East and westbound Alum Rock through traffic will not be impacted. 
North and southbound King Road traffic will be restricted (space) but also continue through.
 
Detours:
Left turns from eastbound Alum Rock to northbound King will be detoured to Jackson:
Eastbound Alum Rock to northbound King – continue east to Jackson,  left on Jackson, left on McKee, continue to King, left onto King.
 
Left turns from southbound King to eastbound Alum Rock will be detoured to San Antonio:
Southbound King to eastbound Alum Rock – continue to San Antonio, left on San Antonio, left on Jackson, left onto Alum Rock.

May 8, 2015
Roadway reconstruction and paving is moving along on schedule and the third segment will begin on the north side of Alum Rock Avenue Monday, May 11, 2015, 7pm from west of McCreery to just beyond King Road.  This segment will take 72 hours, 3 days AND nights, and be complete Thursday, May 14, 7pm.  Driveways will not be accessible by vehicles, and access to Eastgate Avenue via Alum Rock Avenue will be closed for the 72 hours. Please use posted detours. Businesses located on the north side of Alum Rock within this segment will be accessible for pedestrians via the sidewalk.

Crews will work in the outer lanes while passing through the intersection at King Road. Access for through traffic on King Road will be shifted to the center lanes.

Additionally, crews will complete the roadwork and paving in in the center lanes at the intersection of King Road & Alum Rock Avenue beginning Friday, May 15, 7pm, through Sunday, May 17, 7pm. Vehicle access will be shifted to the outside lanes to allow through traffic. Details are available Roadway Paving May 11-17.


May 1, 2015
Weekend Work: Alum Rock Avenue Roadway Reconstruction and Paving begins a smaller segment Friday evening, May 1, 2015, 7pm, in front of Sunbelt Rentals, Pacific Pride/Coast Oil, K&M Motors, and CP Beauty/Tax Services, located between Jose Figueres Avenue and N. Sunset Avenue.  Businesses located on the north side of Alum Rock within this segment will be accessible for pedestrians via the sidewalk.

Crews will also work in the center lanes of N. Sunset Avenue. Access on N. Sunset will be in the outer lanes. This weekend operation will take 3 days AND nights, and be complete Sunday, May 3, 7pm.  This is on the north side of Alum Rock only. Driveways located on the north side of Alum Rock within this segment will not be accessible by vehicles.  Please use posted detours and park on nearby side streets.  Full details are available Roadway & Paving Weekend Segment 1.


The next segment will begin Monday, May 4, 2015, 7pm from N. Sunset Avenue, continuing west to just beyond McCreery Avenue.  This segment will also take 3 days AND nights, and be complete Thursday, May 7, 7pm.  Driveways will not be accessible by vehicles (The shopping center will have alternating driveway access), and sidewalks are open.

Crews will also work in the outer lanes of N. Sunset Avenue. Access on N. Sunset will be in the center lanes.Please use posted detours. Full details are available Roadway & Paving 5/4-7


April 24, 2015
A conflict with an underground utility line has been mitigated and Alum Rock Avenue Roadway Reconstruction and Paving resumes Monday night, April 27, 2015, 7pm, from N. Jackson Avenue, heading west to just beyond Jose Figueres Avenue.  This operation will take 3 days AND nights (72 hours), and this segment will be complete Thursday, April 30, 7pm.  This is on the north side of Alum Rock only.

Businesses located on the north side of Alum Rock within this segment will be accessible for pedestrians via the sidewalk, and cars can enter the parking lots from Jackson Avenue, behind Auto Zone. Jose Figueres will be closed at the intersection. Please use posted detours.  Full details are available: Roadway & Paving, Segment 1.

Alum Rock Paving 4/27-4/30


April 20, 2015
Access for southbound traffic on S.24th Street between E.Santa Clara and E. San Fernando Streets will be temporarily restricted. Please use posted detours beginning Monday, April 20, 2015 through April 28, 2015. For work description select 24th Street Notice, and for larger map of the detour below, select S.24th Street Detour.

April 13, 2015
Alum Rock Avenue Roadway Reconstruction and Paving begins tonight, April 13, 2015, 7pm, from N. Jackson Avenue, heading west to just past Jose Figueres Avenue.  This operation will take 3 days AND nights, and this segment will be complete Thursday, April 16, 7pm.  This is on the north side of Alum Rock only. Driveways located on the north side of Alum Rock within this segment will not be accessible. Jose Figueres will be closed at the intersection. Please use posted detours.  Full details are available: Alum Rock Avenue Roadway

March 27, 2015
Construction will continue along the north side (westbound) of Alum Rock Avenue between U.S. 101 and Capitol Avenue.  Roadway reconstruction and paving will be performed in segments of Alum Rock Avenue. Each segment will take 72 hours to complete and will include 2-3 nights of construction activities.  Driveways will be inaccessible to all vehicles except emergency vehicles during this 72 hour period. Pedestrian access will be maintained.  Residents and businesses located on Alum Rock Avenue will be notified in person of exact dates and activities up to 2 weeks in advance their segment. To learn more about what to expect please review the attached Alum Rock Construction Update. Segment notices with additional details including noise and parking mitigation suggestions will be posted on this page as they are scheduled.

March 27, 2015
Access for northbound traffic on S.17th Street between E.Santa Clara and E. San Fernando Streets will be temporarily restricted. Please use posted detours (northbound use S.15th) beginning Monday, March 30, 2015 through Thursday, April 2, 2015. For work description select 17th Station Notice, and for larger map of detour below, select S.17th Street Detour.
17th Street Detour
February 26, 2015

Construction of the northbound Alum Rock BRT station located on Capitol Avenue at Wilbur Avenue will begin on or about the week of March 2, 2015.  Construction of the platform will take up to four months.  For complete details including traffic impacts, please open the attached link: Northbound Alum Rock BRT Notice.
 

January 8, 2015
A portion of the new permanent sidewalk and handicap ramp located at E. Santa Clara Street and 24th Street will be constructed starting Monday, January 12, 2015. The new sidewalk will
open Friday morning, January 16. For details please open the attached link: 24th Street Sidewalk Completion

Additional potholing activities are scheduled E. Santa Clara Street Downtown. For details please open the attached link: Downtown Potholing Notice (January 2015)

December 29, 2014 (Construction Notice)
Beginning Monday, January 5, 2015, PG&E will be working on the north side of Santa Clara Street between First and Second streets for up to 10 working days. For details please open the attached link: PG&E-Gas Meter Relocation

November 19, 2014 (Construction Notice)
Potholing activities (utility investigations) along eastbound Santa Clara Street between First and Fifth Streets will begin on or about November 20, 2014 (pending potential rain).  This activity will be completed and cleared by end of day  Wednesday, November 26, 2014, in time for Thursday morning's Thanksgiving Turkey Trot.For details please open the attached link: Downtown Potholing Notice.

November 19, 2014 (Construction Notice)
Station construction will begin on or about December 1, 2014 at the eastbound stations located on Santa Clara and 17th Street, and Santa Clara at 24th Street.  For complete details, please open the following links:
Eastbound 17th Station, Eastbound 24th Station.
 

October 2, 2014 (Construction Notice - Downtown San Jose)
Construction crews will perform sanitary sewer work along the north side (westbound direction) of Santa Clara Avenue between 1st and 2nd Streets.  For details and traffic/parking impact please select Downtown Westbound Santa Clara-Sanitary Sewer(2)

October 2, 2014 (Construction Notice - 24th Street)
Southbound 24th Street will be closed at St.John Street,and through traffic will be detoured.  For full details please select 24th Street Closure notice.
 

September 26, 2014 (Construction Notice - Downtown Mitchell Parking Lot)
Conduit work that was previously scheduled for installation in the Mitchell Parking lot (downtown San Jose) on August 29 was rescheduled and will begin on Monday, September 29, 2014.  Work will begin in the parking lot and then expand onto North 1st. Street.  For more details please see the Mitchell Parking Notice, and Mitchell Lot Conduit site plan.

September 26, 2014 (Construction Notice - Downtown Station)
Construction crews will be working on the sanitary sewer system along the north side (westbound) of Santa Clara Avenue between 1st and 2nd Streets beginning Monday, September 29, 2014.  Select the notice for details: Downtown Westbound Santa Clara-Sanitary Sewer

September 19, 2014 (Construction Notice - Potholing Westbound Santa Clara between 1st and 2nd Streets)
Construction crews will pothole (utility investigations) along westbound Santa Clara Avenue between 1st and 2nd Streets on Monday, September 22, 2014.  For the full notice and bus stop relocation notice, please select the following links: Potholing Westbound Santa Clara, Westbound/Downtown Bus Stop Relocation

August 29, 2014 (Construction Notice -Mitchell Parking Lot/North First Street)
Conduit will be installed in the Mitchell Block Parking lot (downtown San Jose), extending into North 1st Street.  Work will begin on N. 1st and then move to the parking lot on September 8. Parking spaces may be reduced up to 30 spaces during this time. This work is expected to take one month. For more details please see Mitchell Parking Notice, and Mitchell Lot Conduit site plan.

August 25, 2014 (Monthly Activities Update)
The Santa Clara/Alum Rock Bus Rapid Transit project construction activities are underway throughout the corridor, and will be significantly increasing in September.  Please review the following notice for a full project update via the
Monthly Project Update: August 25, 2014

August 20, 2014 (Construction Notice - Alum Rock Avenue)
Construction is scheduled along Alum Rock Avenue between U.S. 101 and Capitol Avenue.  Please review the Alum Rock Construction Notice for details of activities that will occur. Staff is available to assist you with specific activity information if you have property located in the construction zone.  Contact information is on the notice.

July 11, 2014 (Construction Notice - Update)
Station construction at both westbound stations located on Santa Clara and 17th Streets, and Santa Clara at 24th Streets  update:  Traffic control consisting of lane shifts (striping) and signal placement will be placed on Monday, July 14, and construction activities will begin Tuesday, July 15.  Activities will begin at 6am on Tuesday only on the northwest corner of E. Santa Clara & 24th, so that sidewalk demo will be complete and pedestrian access is ready in time for the businesses located at the corner to open. For complete details, please open the following links: Westbound 17th Station, Westbound 24th.

June 27, 2014 (Monthly Activities Update)

Utility relocation efforts continue along Alum Rock Avenue and Santa Clara Street to remove conflicts between the private utilities and the bus rapid transit construction. 
Construction crews started working on the future Ocala and Story Road Stations, and the Alum Rock Station. Traffic lanes have shifted in order to provide room to perform the road and shoulder work, and median work. Pedestrian and driveway access is maintained. Please follow construction, no parking, and detour signs.  For full notice, select Monthly Project Update: June 27, 2014.   


June 27, 2014 (Construction Notice)
Station construction will begin in mid-July at both westbound stations located on Santa Clara and 17th Streets, and Santa Clara at 24th Streets.  Crews are anticipating a July 10 start date. For complete details, please open the following links: Westbound 17th Station, Westbound 24th.

June 27, 2014 (Construction Notice)
PG&E will begin relocation of a gas main located at Alum Rock & McCreery. For complete details please open: PGEG-McCreery

June 13, 2014 (Construction Notice)
PG&E will be relocating gas meters downtown on Santa Clara Street between 1st and 2nd Streets beginning Tuesday, June 17, 2014.  Crews will be working on both sides of the streets for approximately 2-3 days per gas meter location, up to a month long combined, and this will result in closing the shoulder/parking lane and portions of the sidewalk.  Pedestrian access will be maintained at all times. Bus stops will not be impacted. For more information please select the PGEG Meter Relocation.

June 10, 2014 (Construction Notice)
PG&E will be working on the south side (eastbound) of  Alum Rock Avenue, between Scharff and Jackson, replacing underground conduit.  For information please read the notice, Underground Conduit Relocation.

BRT construction crews will be working on the north side (westbound) Santa Clara between 5th and 6th, and also between Cahill and Autumn for potholing and street repair, June 10-12, 2014.  For information please read, Potholing Notice.

BRT construction crews will begin station work week of July 23, 2014 for the Arena Stations. This will result in permanent lane and sidewalk closures for approximately 6 weeks in front of the Arena and across the street.  For information please read the Arena Construction notice.

June 9, 2014 (Construction Notice)
Potholing and PG&E utility relocation activities will occur this week on Santa Clara Street between First and Second Streets.  Select Potholing and PG&E for details.

June 4, 2014 (Construction Notice)
Construction of the Alum Rock Station will begin June 9 and there will be impacts to traffic on Capitol Avenue between Emilie Drive and Wilbur. Read more of what to expect: Alum Rock Station Construction Notice.

June 2, 2014 (Monthly Activities Update)

Utility relocation efforts continue along Alum Rock Avenue and Santa Clara Street to remove conflicts between the private utilities and the bus rapid transit construction.  Beginning this week, construction crews will be busy working along Capitol Expressway on the future Ocala and Story Road Stations, and the Alum Rock Station on Capitol Avenue. You can expect to see traffic lanes shifting in order to provide room to perform the road and shoulder work, and median work. Pedestrian and driveway access will be maintained. Please follow construction, no parking, and detour signs.  To read the full update please select Monthly Project Update, June 2, 2014


May 28, 2014 (Construction Notice)

Potholing activities will occur on Santa Clara Street downtown between First and Second Streets. Select Potholing, May 28, 2014 for details.

May 21, 2014 (Construction Notice)
Conduit replacement will occur along the eastside of the sidewalk on First Street, north of Santa Clara Avenue. Select 'Conduit' for more information.

May 6, 2014 (Construction Notice)
Overnight tree removal on Santa Clara St. between 1st and 2nd has been scheduled to take place May 8, 2014. Select 'Tree Removal Notice' for more information.

April 25, 2014 (Construction Notice)
Potholing activities will occur on Santa Clara Street at City Hall, Downtown, and Arena stations.  Select Potholing, April 28, 2014 for details.

April 21, 2014 (Monthly Activities Update)
As the utility relocation effort continues along Alum Rock Avenue and Santa Clara Avenue to remove conflicts between the private utilities and the bus rapid transit construction, roadway and sidewalk work on the north side of Alum Rock Avenue is ramping up to begin. Within the next few months, traffic lanes will be shifted to the south side of Alum Rock Avenue in order to provide room to perform the road work on the north side. Pedestrian and driveway access will be maintained. Please follow construction, no parking, and detour signs. To read the rest of this monthly update, please select Monthly Project Update, April 21, 2014.
 


March 18, 2014 (Monthly Activities Update)
Please select the link Construction Update for March 18, 2014 that provides updated information regarding construction of the Santa Clara-Alum Rock Bus Rapid Transit project.
We welcome your feedback and questions.  You can contact me directly, or through community.outreach@vta.org, 408-321-7575.


February 21, 2014 (Monthly Activities Update)
VTA is about to begin the construction of the Santa Clara-Alum Rock Bus Rapid Transit project and we have the following updates below for you.  A detailed newsletter/construction notice was mailed and posted to www.vta.org/scar-brt with additional details about what to expect once construction begins. Select the linked Construction Update for February 21, 2014 for more information.
 
Neighborhoods and Associations – Community Outreach is in the process of coordinating construction updates to interested organizations along the corridor.  If you would like VTA staff to present to your organization (school, neighborhood, HOA, etc.) please contact us at 408-321-7575.

Addendums

  • Addendum 1 (PDF 1,123K)
    • Appendix A - Preliminary Station Architectural Platform Plans
    • Appendix B - Supplemental Traffic Analysis (PDF 7K), May 2010 (PDF 151K); Supplemental Traffic Analysis, June 2011 (PDF 1,132K)
    • Appendix C - Climate Change Update (PDF 176K)
    • Appendix D - Phase 2 Preliminary Site Assessment Report and Groundwater Maps (PDF 1,632K)
    • Appendix E - Preliminary Right of Way Map (PDF 3,227)
    • Appendix F - Tree Inventory Report and Preliminary Irrigation and Planting Plans (PDF 17,328K)

 


Volume 1 FEIR

Volume 2 Appendix

 

Upcoming Meetings
Neighborhoods and Associations – VTA Community Outreach staff are available to present to your organization (school, neighborhood, HOA, etc.) please contact us at 408-321-7575. Below is a summary of scheduled and past presentations for Santa Clara-Alum Rock BRT Project. Check back often as the schedule is updated regularly.

Date Group or Neighborhood Association Location District
7/8/15 Plata Arroyo Neighborhood Group Mexican Heritage Plaza 5

No meetings are currently scheduled.

Previous Meetings

Date Group or Neighborhood Association Location District
6/10/15 Plata Arroyo Neighborhood Group Mexican Heritage Plaza 5
5/13/15 Plata Arroyo Neighborhood Group Mexican Heritage Plaza 5
3/4/2015 First Presbyterian Church 49 N. 4th Street, San Jose 3
3/11/2015 Plata Arroyo Neighborhood Group Mexican Heritage Plaza 5
3/25/2015 District 5 Leadership Roundtable Alum Rock Library 5
1/13/2015 San Jose Downtown Association- Historic Committee SJDA offices 3
11/6/2014 VTA:BRT Art Enhancement re: 24th Street Station City Hall 3
10/23/2014 Mayfair Neighborhood Action Committee Mayfair Community Center 5
10/20/2014 District 8 Public Safety Fair Elementary School 8
10/16/2014 VTA: BRT Art Enhancement re: 24th Street Station City Hall 3
10/7/2014 Los Mariposas HOA Los Mariposas Community Room (Alum Rock/Jose Figueres) 5
9/23/2014 VTA: BRT Art Enhancement re: 24th Street Station San Jose High School 3
9/17/2014 VTA: Public Open House VTA Downtown Customer Service Center Lobby 3
9/16/2014 VTA: Public Open House Mexican Heritage Plaza 5
8/7/2014 District 4 National Night Out Berryessa Creek Park 4
7/30/2014 Meadowfair Neighborhood Association Meadowfair Community Center 5
7/23/2014 District 5 United Alum Rock Branch Library 5
7/9/2014 Plata Arroyo Neighborhood Group Mexican Heritage Plaza 5
6/23/2014 SJFD Station # 2 2949 Alum Rock Avenue, San Jose 5
5/21/14 Lyndale Neighborhood Association Lyndale Elementary School, 13901 Nordyke Drive, San Jose 5
5/21/14 Cassell Neighborhood Association Hank Lopez Center, 1694 Adrian Way, San Jose 5
5/15/14 13 Street Neighborhood Action Committee Joyce Ellington Library, 491 E. Empire Street, San Jose 3
5/8/14 Horace Mann Neighborhood Association San Jose City Hall, Room 120 3
5/7/14 Vietnamese-American Chamber of Commerce Phu Lam Restaurant, 3082 Story Road, San Jose NA
4/21/14 Roosevelt Neighborhood Association Roosevelt Youth Center 3
3/27/14 Mayfair Neighborhood Association Mayfair Community Center 5
3/27/14 Eastside Senior Center/Catholic Charities Catholic Charities 5
3/26/14 District 5 Leadership Group Alum Rock Branch Library 5
 
3/12/14 Plata Arroyo Neighborhood Group Mexican Heritage Plaza 5

 

  • Overview
  •  About the Project

    The Santa Clara/Alum Rock Bus Rapid Transit Project will provide just over 7 miles of limited-stop rapid transit service from the Eastridge Transit Center to the Arena Station in downtown San Jose using Capitol Expressway, Alum Rock Avenue and Santa Clara Street. The Santa Clara/Alum Rock Project is the first of three lines, followed by the El Camino Real BRT and Stevens Creek BRT.

    • Special Vehicles – Equipped with green technology and comfortable, modern interiors
    • Enhanced Stations – Attractive shelters, passenger amenities and advanced features
    • Dedicated Lane on Alum Rock – East of 34th street BRT vehicles will travel in a dedicated median bus-way, separated from traffic to improve travel time
    • Transit Signal Priority – Traffic signals stay green as the vehicle approaches the inter­section for faster travel time
    • High-Tech Communications – ‘Up-to-the-minute’ information through electronic message signs at stations and wireless capabilities
    • Rapid Boarding – All-door boarding means faster stops
    • Fast, Frequent, Reliable – BRT lines will operate during the peak times with service every 10 minutes

    Service would be provided at 11 new stations:

    Arena 24th Story
    Downtown San Jose King Ocala
    City Hall Jackson Eastridge
    17th Alum Rock  

    Project Cost and Funding

    The total cost for the Santa Clara/Alum Rock Bus Rapid Transit Project is $114 million. The Metropolitan Transportation Commission (MTC) allocated $90 million from State Proposition 1B funds specifically for the BRT project. The remaining $24 million needed for the project will be funded through the 2000 Measure A Transit Improvements Program.

    Project Schedule

    VTA Board approves Environmental Impact Report December 11, 2008
    Final Design Spring 2013
    Construction Spring/Summer 2014-2016
    Project Completion (Anticipated) Summer 2016

    Fact Sheet

    For more information on the Santa Clara/Alum Rock BRT Project or existing bus and light rail transit services, call VTA Community Outreach at (408) 321-7575, TTY only (408) 321-2330 or email community.outreach@vta.org.

     

  • Construction
  • August 11, 2015 (Activities Update)

    On July 9, 2015, the contractor struck a live gas line on Alum Rock at Ribbs Lane. The gas line was repaired and service restored later that same day. There was no other apparent damage. However, due to this major utility hit and other safety concerns, VTA has directed the contractor to cease all construction activities in the field while VTA and the contractor work to ensure resolution of all safety concerns.

    Community safety is VTA’s top priority, and we are working with the contractor to ensure all safety concerns are resolved before resuming construction. During this stand down period, the contractor will continue to maintain a clean and safe construction zone, and maintain the traffic control along Alum Rock Avenue. 

    While we understand this prolongs the construction project, community safety is a top priority.  We will continue to update you on the progress and to share a more comprehensive schedule update for you, including a schedule for the installation of the new shelters.

    To download this update please select Activites Update, 8-11-15. If you have any questions regarding the Santa Clara-Alum Rock Bus Rapid Transit Project, please contact our information line, 408.321.7575.

    June 17, 2015
    Construction activities will be diverting traffic to the outside curbside lanes in each direction of E. Santa Clara Street at 24th Street and southbound traffic will also be closed on 24th Street beginning Monday, June 22, 2015. For full details please select the following link: 24th Street Paving.

    June 1, 2015
    Beginning Wednesday, June 3, crews will be working downtown San Jose on Santa Clara Street, between Firstt and Fifth Streets, to repair potholes.  They will start between First and Second, and work east. Each location will take 2-3 days.  For complete details, please select the attached link: Downtown Pothole Repair

    May 26, 2015
    The second phase of the final segment scheduled for roadway reconstruction and paving on the north side (westbound) of Alum Rock Avenue begins this evening, Tuesday, May 26, 7pm, through Friday, May 29, 7pm. This segment will take 72 hours, 3 days AND nights. Crews will be working from King Road to just beyond 33rd Street. Complete details of activities are attached in the link: Roadway Reconstruction/Paving.

    Driveways will not be accessible by vehicles except for emergency vehicles, pre-arranged with the SJFD. Businesses and residents located on the north side of Alum Rock will be accessible for pedestrians via the sidewalk.  Consider parking on nearby side-streets during this time.

    Detours
    Northbound/southbound 33rd and 34th streets crossing Alum Rock Avenue, and northbound from Alum Rock Avenue, will be detoured to North King Road.  Please use posted detours.

    • East or westbound Alum Rock to northbound 33rd: continue to King Road, proceed north on King, make a left on St. James, or left on McKee, and left on 33rd.
      • **NOTE: Additional roadway reconstruction/paving at this intersection will continue through Saturday, May 30.
    • East or westbound Alum Rock to northbound 34th: continue to King Road, proceed north on King, make a left on St. James, left on 34th.

    The westbound bus stop at Alum Rock & King will have restricted access, and an alternate bus stop will be in place.  Please see the service notice: Westbound Alum Rock @ King for details.

     
    May 18, 2015


    Roadway reconstruction and paving is nearing completion on the north side of Alum Rock Avenue. The schedule for the final  segment, between King Road and U.S. 101 on the north side of Alum Rock Avenue will be completed in 2 smaller phases. This has been revised to ensure emergency vehicle access, and has been coordinated with the San Jose Fire Department.
     
    This week: Tuesday, May 19 through Thursday, May 21, 2015 – DAY WORK ONLY
     
    Crews will be working in a short stretch between U.S. 101, west, to just beyond the driveway for the Bacalhau Grill restaurant/1555 Alum Rock Avenue.  They will also be working in front of the driveway located immediately west of 1623 Alum Rock.
     
    The following week crews will complete the remainder of the segment Tuesday, May 26, 2015, 7pm.  This segment will take 72 hours, 3 days AND nights, and be complete Friday, May 29, 7pm.  Driveways will not be accessible by vehicles except for those pre-arranged with the SJFD. Please use posted detours.
     
    Businesses located on the north side of Alum Rock will be accessible for pedestrians via the sidewalk.
     
    A reminder and any detour information will be posted later this week. 

    May 15, 2015
    Roadway reconstruction and paving continues this weekend, located on the north end of the intersection of Alum Rock Avenue and King Road beginning this evening (Friday, 5/15) and will be complete late tomorrow night, (Saturday, 5/16).
     
    Traffic on King Road will be shifted on the north side of Alum Rock, and a Traffic Patrol Officer will be at the intersection to guide traffic and pedestrians.
    East and westbound Alum Rock through traffic will not be impacted. 
    North and southbound King Road traffic will be restricted (space) but also continue through.
     
    Detours:
    Left turns from eastbound Alum Rock to northbound King will be detoured to Jackson:
    Eastbound Alum Rock to northbound King – continue east to Jackson,  left on Jackson, left on McKee, continue to King, left onto King.
     
    Left turns from southbound King to eastbound Alum Rock will be detoured to San Antonio:
    Southbound King to eastbound Alum Rock – continue to San Antonio, left on San Antonio, left on Jackson, left onto Alum Rock.

    May 8, 2015
    Roadway reconstruction and paving is moving along on schedule and the third segment will begin on the north side of Alum Rock Avenue Monday, May 11, 2015, 7pm from west of McCreery to just beyond King Road.  This segment will take 72 hours, 3 days AND nights, and be complete Thursday, May 14, 7pm.  Driveways will not be accessible by vehicles, and access to Eastgate Avenue via Alum Rock Avenue will be closed for the 72 hours. Please use posted detours. Businesses located on the north side of Alum Rock within this segment will be accessible for pedestrians via the sidewalk.

    Crews will work in the outer lanes while passing through the intersection at King Road. Access for through traffic on King Road will be shifted to the center lanes.

    Additionally, crews will complete the roadwork and paving in in the center lanes at the intersection of King Road & Alum Rock Avenue beginning Friday, May 15, 7pm, through Sunday, May 17, 7pm. Vehicle access will be shifted to the outside lanes to allow through traffic. Details are available Roadway Paving May 11-17.


    May 1, 2015
    Weekend Work: Alum Rock Avenue Roadway Reconstruction and Paving begins a smaller segment Friday evening, May 1, 2015, 7pm, in front of Sunbelt Rentals, Pacific Pride/Coast Oil, K&M Motors, and CP Beauty/Tax Services, located between Jose Figueres Avenue and N. Sunset Avenue.  Businesses located on the north side of Alum Rock within this segment will be accessible for pedestrians via the sidewalk.

    Crews will also work in the center lanes of N. Sunset Avenue. Access on N. Sunset will be in the outer lanes. This weekend operation will take 3 days AND nights, and be complete Sunday, May 3, 7pm.  This is on the north side of Alum Rock only. Driveways located on the north side of Alum Rock within this segment will not be accessible by vehicles.  Please use posted detours and park on nearby side streets.  Full details are available Roadway & Paving Weekend Segment 1.


    The next segment will begin Monday, May 4, 2015, 7pm from N. Sunset Avenue, continuing west to just beyond McCreery Avenue.  This segment will also take 3 days AND nights, and be complete Thursday, May 7, 7pm.  Driveways will not be accessible by vehicles (The shopping center will have alternating driveway access), and sidewalks are open.

    Crews will also work in the outer lanes of N. Sunset Avenue. Access on N. Sunset will be in the center lanes.Please use posted detours. Full details are available Roadway & Paving 5/4-7


    April 24, 2015
    A conflict with an underground utility line has been mitigated and Alum Rock Avenue Roadway Reconstruction and Paving resumes Monday night, April 27, 2015, 7pm, from N. Jackson Avenue, heading west to just beyond Jose Figueres Avenue.  This operation will take 3 days AND nights (72 hours), and this segment will be complete Thursday, April 30, 7pm.  This is on the north side of Alum Rock only.

    Businesses located on the north side of Alum Rock within this segment will be accessible for pedestrians via the sidewalk, and cars can enter the parking lots from Jackson Avenue, behind Auto Zone. Jose Figueres will be closed at the intersection. Please use posted detours.  Full details are available: Roadway & Paving, Segment 1.

    Alum Rock Paving 4/27-4/30


    April 20, 2015
    Access for southbound traffic on S.24th Street between E.Santa Clara and E. San Fernando Streets will be temporarily restricted. Please use posted detours beginning Monday, April 20, 2015 through April 28, 2015. For work description select 24th Street Notice, and for larger map of the detour below, select S.24th Street Detour.

    April 13, 2015
    Alum Rock Avenue Roadway Reconstruction and Paving begins tonight, April 13, 2015, 7pm, from N. Jackson Avenue, heading west to just past Jose Figueres Avenue.  This operation will take 3 days AND nights, and this segment will be complete Thursday, April 16, 7pm.  This is on the north side of Alum Rock only. Driveways located on the north side of Alum Rock within this segment will not be accessible. Jose Figueres will be closed at the intersection. Please use posted detours.  Full details are available: Alum Rock Avenue Roadway

    March 27, 2015
    Construction will continue along the north side (westbound) of Alum Rock Avenue between U.S. 101 and Capitol Avenue.  Roadway reconstruction and paving will be performed in segments of Alum Rock Avenue. Each segment will take 72 hours to complete and will include 2-3 nights of construction activities.  Driveways will be inaccessible to all vehicles except emergency vehicles during this 72 hour period. Pedestrian access will be maintained.  Residents and businesses located on Alum Rock Avenue will be notified in person of exact dates and activities up to 2 weeks in advance their segment. To learn more about what to expect please review the attached Alum Rock Construction Update. Segment notices with additional details including noise and parking mitigation suggestions will be posted on this page as they are scheduled.

    March 27, 2015
    Access for northbound traffic on S.17th Street between E.Santa Clara and E. San Fernando Streets will be temporarily restricted. Please use posted detours (northbound use S.15th) beginning Monday, March 30, 2015 through Thursday, April 2, 2015. For work description select 17th Station Notice, and for larger map of detour below, select S.17th Street Detour.
    17th Street Detour
    February 26, 2015

    Construction of the northbound Alum Rock BRT station located on Capitol Avenue at Wilbur Avenue will begin on or about the week of March 2, 2015.  Construction of the platform will take up to four months.  For complete details including traffic impacts, please open the attached link: Northbound Alum Rock BRT Notice.
     

    January 8, 2015
    A portion of the new permanent sidewalk and handicap ramp located at E. Santa Clara Street and 24th Street will be constructed starting Monday, January 12, 2015. The new sidewalk will
    open Friday morning, January 16. For details please open the attached link: 24th Street Sidewalk Completion

    Additional potholing activities are scheduled E. Santa Clara Street Downtown. For details please open the attached link: Downtown Potholing Notice (January 2015)

    December 29, 2014 (Construction Notice)
    Beginning Monday, January 5, 2015, PG&E will be working on the north side of Santa Clara Street between First and Second streets for up to 10 working days. For details please open the attached link: PG&E-Gas Meter Relocation

    November 19, 2014 (Construction Notice)
    Potholing activities (utility investigations) along eastbound Santa Clara Street between First and Fifth Streets will begin on or about November 20, 2014 (pending potential rain).  This activity will be completed and cleared by end of day  Wednesday, November 26, 2014, in time for Thursday morning's Thanksgiving Turkey Trot.For details please open the attached link: Downtown Potholing Notice.

    November 19, 2014 (Construction Notice)
    Station construction will begin on or about December 1, 2014 at the eastbound stations located on Santa Clara and 17th Street, and Santa Clara at 24th Street.  For complete details, please open the following links:
    Eastbound 17th Station, Eastbound 24th Station.
     

    October 2, 2014 (Construction Notice - Downtown San Jose)
    Construction crews will perform sanitary sewer work along the north side (westbound direction) of Santa Clara Avenue between 1st and 2nd Streets.  For details and traffic/parking impact please select Downtown Westbound Santa Clara-Sanitary Sewer(2)

    October 2, 2014 (Construction Notice - 24th Street)
    Southbound 24th Street will be closed at St.John Street,and through traffic will be detoured.  For full details please select 24th Street Closure notice.
     

    September 26, 2014 (Construction Notice - Downtown Mitchell Parking Lot)
    Conduit work that was previously scheduled for installation in the Mitchell Parking lot (downtown San Jose) on August 29 was rescheduled and will begin on Monday, September 29, 2014.  Work will begin in the parking lot and then expand onto North 1st. Street.  For more details please see the Mitchell Parking Notice, and Mitchell Lot Conduit site plan.

    September 26, 2014 (Construction Notice - Downtown Station)
    Construction crews will be working on the sanitary sewer system along the north side (westbound) of Santa Clara Avenue between 1st and 2nd Streets beginning Monday, September 29, 2014.  Select the notice for details: Downtown Westbound Santa Clara-Sanitary Sewer

    September 19, 2014 (Construction Notice - Potholing Westbound Santa Clara between 1st and 2nd Streets)
    Construction crews will pothole (utility investigations) along westbound Santa Clara Avenue between 1st and 2nd Streets on Monday, September 22, 2014.  For the full notice and bus stop relocation notice, please select the following links: Potholing Westbound Santa Clara, Westbound/Downtown Bus Stop Relocation

    August 29, 2014 (Construction Notice -Mitchell Parking Lot/North First Street)
    Conduit will be installed in the Mitchell Block Parking lot (downtown San Jose), extending into North 1st Street.  Work will begin on N. 1st and then move to the parking lot on September 8. Parking spaces may be reduced up to 30 spaces during this time. This work is expected to take one month. For more details please see Mitchell Parking Notice, and Mitchell Lot Conduit site plan.

    August 25, 2014 (Monthly Activities Update)
    The Santa Clara/Alum Rock Bus Rapid Transit project construction activities are underway throughout the corridor, and will be significantly increasing in September.  Please review the following notice for a full project update via the
    Monthly Project Update: August 25, 2014

    August 20, 2014 (Construction Notice - Alum Rock Avenue)
    Construction is scheduled along Alum Rock Avenue between U.S. 101 and Capitol Avenue.  Please review the Alum Rock Construction Notice for details of activities that will occur. Staff is available to assist you with specific activity information if you have property located in the construction zone.  Contact information is on the notice.

    July 11, 2014 (Construction Notice - Update)
    Station construction at both westbound stations located on Santa Clara and 17th Streets, and Santa Clara at 24th Streets  update:  Traffic control consisting of lane shifts (striping) and signal placement will be placed on Monday, July 14, and construction activities will begin Tuesday, July 15.  Activities will begin at 6am on Tuesday only on the northwest corner of E. Santa Clara & 24th, so that sidewalk demo will be complete and pedestrian access is ready in time for the businesses located at the corner to open. For complete details, please open the following links: Westbound 17th Station, Westbound 24th.

    June 27, 2014 (Monthly Activities Update)

    Utility relocation efforts continue along Alum Rock Avenue and Santa Clara Street to remove conflicts between the private utilities and the bus rapid transit construction. 
    Construction crews started working on the future Ocala and Story Road Stations, and the Alum Rock Station. Traffic lanes have shifted in order to provide room to perform the road and shoulder work, and median work. Pedestrian and driveway access is maintained. Please follow construction, no parking, and detour signs.  For full notice, select Monthly Project Update: June 27, 2014.   


    June 27, 2014 (Construction Notice)
    Station construction will begin in mid-July at both westbound stations located on Santa Clara and 17th Streets, and Santa Clara at 24th Streets.  Crews are anticipating a July 10 start date. For complete details, please open the following links: Westbound 17th Station, Westbound 24th.

    June 27, 2014 (Construction Notice)
    PG&E will begin relocation of a gas main located at Alum Rock & McCreery. For complete details please open: PGEG-McCreery

    June 13, 2014 (Construction Notice)
    PG&E will be relocating gas meters downtown on Santa Clara Street between 1st and 2nd Streets beginning Tuesday, June 17, 2014.  Crews will be working on both sides of the streets for approximately 2-3 days per gas meter location, up to a month long combined, and this will result in closing the shoulder/parking lane and portions of the sidewalk.  Pedestrian access will be maintained at all times. Bus stops will not be impacted. For more information please select the PGEG Meter Relocation.

    June 10, 2014 (Construction Notice)
    PG&E will be working on the south side (eastbound) of  Alum Rock Avenue, between Scharff and Jackson, replacing underground conduit.  For information please read the notice, Underground Conduit Relocation.

    BRT construction crews will be working on the north side (westbound) Santa Clara between 5th and 6th, and also between Cahill and Autumn for potholing and street repair, June 10-12, 2014.  For information please read, Potholing Notice.

    BRT construction crews will begin station work week of July 23, 2014 for the Arena Stations. This will result in permanent lane and sidewalk closures for approximately 6 weeks in front of the Arena and across the street.  For information please read the Arena Construction notice.

    June 9, 2014 (Construction Notice)
    Potholing and PG&E utility relocation activities will occur this week on Santa Clara Street between First and Second Streets.  Select Potholing and PG&E for details.

    June 4, 2014 (Construction Notice)
    Construction of the Alum Rock Station will begin June 9 and there will be impacts to traffic on Capitol Avenue between Emilie Drive and Wilbur. Read more of what to expect: Alum Rock Station Construction Notice.

    June 2, 2014 (Monthly Activities Update)

    Utility relocation efforts continue along Alum Rock Avenue and Santa Clara Street to remove conflicts between the private utilities and the bus rapid transit construction.  Beginning this week, construction crews will be busy working along Capitol Expressway on the future Ocala and Story Road Stations, and the Alum Rock Station on Capitol Avenue. You can expect to see traffic lanes shifting in order to provide room to perform the road and shoulder work, and median work. Pedestrian and driveway access will be maintained. Please follow construction, no parking, and detour signs.  To read the full update please select Monthly Project Update, June 2, 2014


    May 28, 2014 (Construction Notice)

    Potholing activities will occur on Santa Clara Street downtown between First and Second Streets. Select Potholing, May 28, 2014 for details.

    May 21, 2014 (Construction Notice)
    Conduit replacement will occur along the eastside of the sidewalk on First Street, north of Santa Clara Avenue. Select 'Conduit' for more information.

    May 6, 2014 (Construction Notice)
    Overnight tree removal on Santa Clara St. between 1st and 2nd has been scheduled to take place May 8, 2014. Select 'Tree Removal Notice' for more information.

    April 25, 2014 (Construction Notice)
    Potholing activities will occur on Santa Clara Street at City Hall, Downtown, and Arena stations.  Select Potholing, April 28, 2014 for details.

    April 21, 2014 (Monthly Activities Update)
    As the utility relocation effort continues along Alum Rock Avenue and Santa Clara Avenue to remove conflicts between the private utilities and the bus rapid transit construction, roadway and sidewalk work on the north side of Alum Rock Avenue is ramping up to begin. Within the next few months, traffic lanes will be shifted to the south side of Alum Rock Avenue in order to provide room to perform the road work on the north side. Pedestrian and driveway access will be maintained. Please follow construction, no parking, and detour signs. To read the rest of this monthly update, please select Monthly Project Update, April 21, 2014.
     


    March 18, 2014 (Monthly Activities Update)
    Please select the link Construction Update for March 18, 2014 that provides updated information regarding construction of the Santa Clara-Alum Rock Bus Rapid Transit project.
    We welcome your feedback and questions.  You can contact me directly, or through community.outreach@vta.org, 408-321-7575.


    February 21, 2014 (Monthly Activities Update)
    VTA is about to begin the construction of the Santa Clara-Alum Rock Bus Rapid Transit project and we have the following updates below for you.  A detailed newsletter/construction notice was mailed and posted to www.vta.org/scar-brt with additional details about what to expect once construction begins. Select the linked Construction Update for February 21, 2014 for more information.
     
    Neighborhoods and Associations – Community Outreach is in the process of coordinating construction updates to interested organizations along the corridor.  If you would like VTA staff to present to your organization (school, neighborhood, HOA, etc.) please contact us at 408-321-7575.

  • Document Library
  • Addendums

    • Addendum 1 (PDF 1,123K)
      • Appendix A - Preliminary Station Architectural Platform Plans
      • Appendix B - Supplemental Traffic Analysis (PDF 7K), May 2010 (PDF 151K); Supplemental Traffic Analysis, June 2011 (PDF 1,132K)
      • Appendix C - Climate Change Update (PDF 176K)
      • Appendix D - Phase 2 Preliminary Site Assessment Report and Groundwater Maps (PDF 1,632K)
      • Appendix E - Preliminary Right of Way Map (PDF 3,227)
      • Appendix F - Tree Inventory Report and Preliminary Irrigation and Planting Plans (PDF 17,328K)

     


    Volume 1 FEIR

    Volume 2 Appendix

     

  • Events
  • Upcoming Meetings
    Neighborhoods and Associations – VTA Community Outreach staff are available to present to your organization (school, neighborhood, HOA, etc.) please contact us at 408-321-7575. Below is a summary of scheduled and past presentations for Santa Clara-Alum Rock BRT Project. Check back often as the schedule is updated regularly.

    Date Group or Neighborhood Association Location District
    7/8/15 Plata Arroyo Neighborhood Group Mexican Heritage Plaza 5

    No meetings are currently scheduled.

    Previous Meetings

    Date Group or Neighborhood Association Location District
    6/10/15 Plata Arroyo Neighborhood Group Mexican Heritage Plaza 5
    5/13/15 Plata Arroyo Neighborhood Group Mexican Heritage Plaza 5
    3/4/2015 First Presbyterian Church 49 N. 4th Street, San Jose 3
    3/11/2015 Plata Arroyo Neighborhood Group Mexican Heritage Plaza 5
    3/25/2015 District 5 Leadership Roundtable Alum Rock Library 5
    1/13/2015 San Jose Downtown Association- Historic Committee SJDA offices 3
    11/6/2014 VTA:BRT Art Enhancement re: 24th Street Station City Hall 3
    10/23/2014 Mayfair Neighborhood Action Committee Mayfair Community Center 5
    10/20/2014 District 8 Public Safety Fair Elementary School 8
    10/16/2014 VTA: BRT Art Enhancement re: 24th Street Station City Hall 3
    10/7/2014 Los Mariposas HOA Los Mariposas Community Room (Alum Rock/Jose Figueres) 5
    9/23/2014 VTA: BRT Art Enhancement re: 24th Street Station San Jose High School 3
    9/17/2014 VTA: Public Open House VTA Downtown Customer Service Center Lobby 3
    9/16/2014 VTA: Public Open House Mexican Heritage Plaza 5
    8/7/2014 District 4 National Night Out Berryessa Creek Park 4
    7/30/2014 Meadowfair Neighborhood Association Meadowfair Community Center 5
    7/23/2014 District 5 United Alum Rock Branch Library 5
    7/9/2014 Plata Arroyo Neighborhood Group Mexican Heritage Plaza 5
    6/23/2014 SJFD Station # 2 2949 Alum Rock Avenue, San Jose 5
    5/21/14 Lyndale Neighborhood Association Lyndale Elementary School, 13901 Nordyke Drive, San Jose 5
    5/21/14 Cassell Neighborhood Association Hank Lopez Center, 1694 Adrian Way, San Jose 5
    5/15/14 13 Street Neighborhood Action Committee Joyce Ellington Library, 491 E. Empire Street, San Jose 3
    5/8/14 Horace Mann Neighborhood Association San Jose City Hall, Room 120 3
    5/7/14 Vietnamese-American Chamber of Commerce Phu Lam Restaurant, 3082 Story Road, San Jose NA
    4/21/14 Roosevelt Neighborhood Association Roosevelt Youth Center 3
    3/27/14 Mayfair Neighborhood Association Mayfair Community Center 5
    3/27/14 Eastside Senior Center/Catholic Charities Catholic Charities 5
    3/26/14 District 5 Leadership Group Alum Rock Branch Library 5
     
    3/12/14 Plata Arroyo Neighborhood Group Mexican Heritage Plaza 5

     

  • Image Gallery

Connect
With Us: