Due to light rail improvement work, a bus bridge will be in effect on the Orange Line fromSeptember 2 to September 17. Please visit our Rail Rehab page for modified schedules and more details.
Notice
2025–2026 Civil Grand Jury Report: Read about the 2025-2026 Santa Clara County Civil Grand Jury Report. READ THE REPORT
VTA seeks Proposals from qualified firms to provide rail ultrasonic flaw detection (“Services”) to comply with the Federal Railroad Administration (“FRA”) Track Safety Standards of 49 CFR Part 213.237, as part of the annual track maintenance program. The service contract would be for a five-year term with two (2) - one (1) year options to perform annual ultrasonic rail flaw detection inspections of the entire VTA light rail system (approximately 78 miles) and VTA-owned Union Pacific (“UP”) line (approximately 6 miles). The selected firm (“Contractor”) will be required to use an ultrasonic rail vehicle to inspect the main line tracks and meet inspection frequency in accordance with the FRA Track Safety Standards set forth in 49 CFR Part 213.237.