Ongoing Construction Activities

  • Pile Driving & Excavation: Expect loud noise and vibrations near the interchange while crews drill foundations and install piles.
  • Roadwork & Paving: Crews will be grading, laying base materials, and paving on the connector and interchange approaches. Drivers may see construction vehicles entering/exiting the roadway.
  • Material Hauling: Trucking between staging areas will increase traffic on local haul routes.

Key Dates

  • Aug 26 – Sept 5: Road excavation, grading, and paving work on connector ramps.
  • Aug 26 – Sept 13: Pile driving and column work at interchange bridges.
  • Sept 2 – Sept 3: Soil testing (increased truck activity).

For more info: vta.org/sr25 | (408) 321-7575

Why

VTA continues construction on the US 101/SR 25 Interchange in Gilroy. Drivers should expect the following impacts over the next few days (weather and conditions permitting):

Community Impacts

What Drivers Should Expect

  • Intermittent lane/ramp closures and slower traffic through the work zone.
  • Construction noise and dust near the interchange.
  • Increased presence of construction trucks in and around the project area.

We encourage drivers to:

  • Use alternate routes when possible.
  • Allow extra travel time, especially during commute hours.
  • Stay alert and follow posted construction signs and reduced speed limits.
Traffic Impacts

Night Work, On/Off-Ramp Closures and Detours:

  • August 27-28, between 9:00 PM - 5:00 AM, Southbound off and on ramps
  • September 2-5, between 9:00 PM - 5:00 AM, Southbound off and on ramps
  • September 3, between 9:00 PM - 5:00 AM, Southbound off and on ramps, and the Southbound # 2 Lane
  • September 8-12, between 9:00 PM - 5:00 AM, Southbound off and on ramps

Detour Route for Overnight closure of the US 101 southbound on-ramp:

  • Continue north on SR 25
  • Follow detour signs onto Monterey Road
  • Reconnect to southbound US 101 at the Monterey Road interchange

Detour Route for Overnight closure of the US 101 southbound off-ramp

  • Continue South on US 101 to Betabel Road
  • Betabel Road to Northbound US 101
  • Northbound US 101 to Southbound SR 25
SR25 Traffic Advisory Map 8.27.2025

SR25 Traffic Advisory Map 8.27.25