I-280/Wolfe Road Interchange Improvements Project

The Santa Clara Valley Transportation Authority (VTA), in cooperation with the City of Cupertino and the California Department of Transportation (Caltrans), proposes to modify the Wolfe Road interchange on Interstate 280 (I-280) in the City of Cupertino.

Objectives

The purpose of this project is to improve traffic operations, and facilities for several modes of transportation including bicycle, pedestrian and high occupancy vehicle uses at the I-280 and Wolfe Road interchange in the City of Cupertino.

Project Features

The proposed improvements include, but are not limited to, the...

The Santa Clara Valley Transportation Authority (VTA), in cooperation with the City of Cupertino and the California Department of Transportation (Caltrans), proposes to modify the Wolfe Road interchange on Interstate 280 (I-280) in the City of Cupertino.

Objectives

The purpose of this project is to improve traffic operations, and facilities for several modes of transportation including bicycle, pedestrian and high occupancy vehicle uses at the I-280 and Wolfe Road interchange in the City of Cupertino.

Project Features

The proposed improvements include, but are not limited to, the following:

  • Construct new structure carrying Wolfe Road over I-280.
  • Construct new on-ramps and off-ramps.
  • Modify existing local street intersections and upgrade bicycle and pedestrian facilities along Wolfe Road; and
  • Construct retaining walls and sound walls as needed.

Virtual Community Meeting

The public is invited to participate in a virtual Open House Wednesday, December 9 at 6:00 p.m. There will be a brief presentation on the preferred design for the I-280 and Wolfe Road Interchange. 

Individuals who require language translation, American Sign Language, or other assistance are requested to contact VTA Community Outreach at (408) 321-7575, TTY (408) 321-2330, at least five (5) business days before the public information meeting.

December 9, 2020 at 6:00 p.m.
Virtual Open House
See more information about this event at Eventbrite
View mailer here

Timeline

Title
Alternatives Analysis
Phase Date Range
-
Title
Conceptual Exhibits-Open House
Milestone Date
Title
Environmental Clearance
Phase Date Range
-
Title
Tabled at the City of Cupertino’s Silicon Valley Fall Festival
Milestone Date
Title
Tabled at Junipero Serra Trail Study (2-day Open House)
Milestone Date
Title
Design and Engineering
Phase Date Range
-
Title
PS&E Phase in progress
Milestone Date
Title
Blog: Virtual Open House: I-280 and Wolfe Road Improvements Project
Milestone Date
Body

The public is invited to participate in a virtual Open House Wednesday, Dec. 9 at 6 p.m. VTA, in partnership with the City of Cupertino, and the California Department of Transportation (Caltrans), will provide project updates and present the final design for the I-280 and Wolfe Road Interchange Project, funded by 2016 Measure B sales tax. Read more. 

Title
Virtual Open House: Preferred Alternative Design (at 6:00 p.m.)
Milestone Date
Body
See more information about this event at Eventbrite

View mailer here

Title
Construction
Phase Date Range
-

Funding

Total Funding
$80 million - $90 million
Amount
$80 million - $90 million

Map

Subscribe to Updates

Email Address (required) *